Laserfiche WebLink
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> nlc. <br /> 1. Approved plans must be on job site at all times and available for inspectors. nl nnlnll Site Address: <br /> 2. See face of permit for permit conditions of approval and additional requirements. 2300 M ERRI LL CREEK <br /> APPROVED This approval only applies to P K W Y <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at Oft.f Comma 1y,P1-­n98E—mi.Development the work being performed under <br /> PLANNING DEPARTMENT Permit# B2505-013 <br /> onlinepermits.everettwa.govto formally request all required inspections. NAME: Jessica Jaw! and does not recognize any <br /> existing structure that may not <br /> DATE: 05/14/2025 meet Zoning Code. Owner: <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. RAI N ER PROPERTIES LLC <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER Tenant: <br /> 811. BUILDING: ZAP ENERGY <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of <br /> Everett. App. Date: <br /> EVEnErr I City of Everett Permit Services Additional Permits Are Required <br /> REVIEWED FOR CODE COMPLIANCE For This Project To Include: 5/5/2025 <br /> 7. Protect all existing underground utilities during construction. By Review Discipline:Building ❑ Plumbing ❑X Sprinkler <br /> Reviewer:SSchrefRer ❑ Mechanical ❑X Fire Alarm <br /> Date:05/0912025 <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as Review Status:Approved for Permit ® Electrical Public Works Permit Type: <br /> directed by the City PW Inspector. <br /> M2501-088 COMMERCIAL BUILDING <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious -FIREe Subtype: <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the COMMERCIAL <br /> City's right-of-way and/or easements and the improvements located therein. ALTERATION (T.I., <br /> INTERIOR DEMO, <br /> ADDITION, ETC) <br /> Description: <br /> Installation of furred <br /> walls and additional <br /> P161BLIG WQFXS: insulation. <br /> F. City of Everett Permit Services No changes to storm,traffic,sewer,or water proposed. <br /> EVERETT Reviewed for Permit 05/14/2M All interior work. <br /> PERMIT NUMBER: <br /> B2505-013 <br />