My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY 2025 ZAP ENERGY Plans 2025-11-04
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
Plans
>
2300 MERRILL CREEK PKY 2025 ZAP ENERGY Plans 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 11:30:35 AM
Creation date
11/4/2025 11:30:14 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Permit
B2505-013
Year
2025
Notes
Installation of furred walls and additional insulation.
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> nlc. <br /> 1. Approved plans must be on job site at all times and available for inspectors. nl nnlnll Site Address: <br /> 2. See face of permit for permit conditions of approval and additional requirements. 2300 M ERRI LL CREEK <br /> APPROVED This approval only applies to P K W Y <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at Oft.f Comma 1y,P1-n98E—mi.Development the work being performed under <br /> PLANNING DEPARTMENT Permit# B2505-013 <br /> onlinepermits.everettwa.govto formally request all required inspections. NAME: Jessica Jaw! and does not recognize any <br /> existing structure that may not <br /> DATE: 05/14/2025 meet Zoning Code. Owner: <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. RAI N ER PROPERTIES LLC <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER Tenant: <br /> 811. BUILDING: ZAP ENERGY <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of <br /> Everett. App. Date: <br /> EVEnErr I City of Everett Permit Services Additional Permits Are Required <br /> REVIEWED FOR CODE COMPLIANCE For This Project To Include: 5/5/2025 <br /> 7. Protect all existing underground utilities during construction. By Review Discipline:Building ❑ Plumbing ❑X Sprinkler <br /> Reviewer:SSchrefRer ❑ Mechanical ❑X Fire Alarm <br /> Date:05/0912025 <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as Review Status:Approved for Permit ® Electrical Public Works Permit Type: <br /> directed by the City PW Inspector. <br /> M2501-088 COMMERCIAL BUILDING <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious -FIREe Subtype: <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the COMMERCIAL <br /> City's right-of-way and/or easements and the improvements located therein. ALTERATION (T.I., <br /> INTERIOR DEMO, <br /> ADDITION, ETC) <br /> Description: <br /> Installation of furred <br /> walls and additional <br /> P161BLIG WQFXS: insulation. <br /> F. City of Everett Permit Services No changes to storm,traffic,sewer,or water proposed. <br /> EVERETT Reviewed for Permit 05/14/2M All interior work. <br /> PERMIT NUMBER: <br /> B2505-013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.