Laserfiche WebLink
ENVELOPE COMPLIANCE SUMMARY <br /> 2021 WSEC Compliance Fonns for Commercial Buildings including Group R2,R3&R4 over 3 stories and all Rl Administered by:CG2025 NEEA,All rights reserved <br /> Project Title Zap Energy-Lithium Lab-2021 WSEC For Building Department Use: 0 <br /> Date: Mar 11,2825 <br /> Project Address 2300 Merrill Creek Parkway t e r m arma n s O n <br /> Project&Applicant Everett,WA 98203 <br /> Information Applicant Name David Nehren <br /> Applicant Phone 206-575-9700 Building Today,Defining Tomorrow <br /> Applicant Email dnehren@hermanson.com <br /> For questions about this report,contact WSEC Conwacial Technical Support at 360-539-5300 or via email at rom.h chsupport@waenergycodes.com Hermansan Company LLP <br /> General Building Use 1221 2nd Avenue North <br /> General Occupancy All Commercial .Typos) Manufactunng/Facmry Building Cond.Floor Area 92,925 Kent,Washington 98032 <br /> Project Cond.Floor Area 1,279 Tel:(206)575-9700 <br /> Project Scope Alteration Sp ace Conditioning Fully Conditioned Floors Above Grade I Fax:(206)575-9800 <br /> Change in Space Conditioning(Semi-heated convened to Fully Conditioned) Categories Compliance Method Oeveral Prescriptive wvrw.hermanson.com <br /> Project is convening a apace within a sani-heated portion of an existing 1995 construction building into a conditioned(healed and cooled)space that now requires envelope upgrades to within 10%of current cede values. Contractor Reg f:HERMACLO05BJ <br /> Envelope Project Existing space has(3)hollow-Dore metal doors that will be analyzed at U0.99[max that can be entered in the envelope compliance tool].No slab on grade insulation after onsite inspection[although it was required in the <br /> Deacrip. S&C parrrit does Rom 1995].R-49 hall will be applied(without framing d...te)above the mom ceiling to the factory type area(noted as vented since allowable air movement above this insulation).Existing mass and steel <br /> partition walls win be supplemented with additional insulation as noted in assembly details to make up for the poor door and slab performance in the UV Tradeoff calculations(assemblies auslyzed per Appendix A <br /> provisions).Please note that the,of skylight is open for visual to the factory area outside this space and is not a part of the scope of work. <br /> Envelope Scope Space Conditioning Compliance Method WWR/SRR UA Calculation Adjustment Fenestration Compliance <br /> Compliance Cate cry er Category Alternates Verification <br /> Scope and Chan S Conditioning Full Conditioned Component erformance 7.83%/0% Change of space conditioning allowance No alternates selected COMPLIES <br /> Method Change in pace g y pones p None selected <br /> Additional Energy Efficiency(AEC) No envelope or miscellaneous additional energy efficiency measures included in Load Management(LDM) No envelope load management measure credits FUME HOOD <br /> Measures Included project Measures Included included in pmject <br /> While noted in C505.3 for change in space <br /> conditioning,we would ask for a vananc,on <br /> the testing compliance.There is minimal energy <br /> use impacts due to infiltration even possible ZAP ENERGY <br /> Air Barrier Testing Air barrier testing not included Air Barrier comments with interior partition walla and ceiling 2300 MERRILL CREEK PKWY <br /> separation to adjacent space INSIDE the <br /> building(and exterior wall is solid concrete tilt EVERE7, WA 98203 <br /> up,no glazing or framed construction prone to <br /> leakage) <br /> P Zap Energy-Lithium Lab-2021 WSEC <br /> Scope&Space Condi[ionin ACE CONDITIONING-FULLY CONDITIONED Compliance Verification COMPLIES <br /> Window-m-wall Ratio 7.83% Skylight-to-roof-ratio 0% Vertical Nenestration Alternate No alternates selected <br /> A�gODOR� <br /> Opaque Envelope Assemblies Jti9 OY WAS/,F+y <br /> Insulation R-Values <br /> Location in Conttnuous 2nd Layer Oe 2 <br /> RooDCeiling Documents Assembly ID Assembly Location Cavity (%penetration) (MB Root) U-Factor Net Area(BF) <br /> Am,and other M0.05 I Rl(existing ceiling with r49 bad_vented above) Exterior R-0 R-49(10.04%) U-0.020 1 1,279 <br /> U-Factor Source:ASHRAE 90.1 Appendix A M0.05)r Somce Description:Appendix Acomponent/assembly calculation(see detail sheet q g,A 3614 <br /> Roof Framing Type:Standard Roof Framing Depth(Inches):0(ceiling only with batt on top,not inside barred members) "Y4,�e00N�E <br /> Roof Fmm n S a n (OC):0(ceilingonly with bats on top,not inside furred members) Roof Framing Material:Other material �S <br /> Cetling/Attic Vent nrg:Vented New,upgraded or unaltered existing?:Upgraded existing assembly March 12,2025 <br /> Walls Location In Assembly ID Assembly Location Cavity Conttnuous Insulated Wall U-Factor Net Area(SF) <br /> Documents (%penetration) Furring <br /> Sterl-framed-Commcmial M0.05 W 1-Interior R11_2x4 steel stud plus R13 rigid z-furred Interior pmlition R-11 R-13(,0.08%-0.12%)1 U4066 700 <br /> U-Facmr Soume:ASHRAE 90.1 Appendix A U-Factor Source Description:Appendix A component/assembly calculation(see detail shed <br /> M0.05) <br /> pruning Depth:2,4 Other Framing D the C D S E T <br /> Framing Spacing(OC):16 New,upgraded or unaltered existing?:Upgraded existing assembly Mass(precast concrete)- Exterior&above <br /> Commercial M0.05 W2-exterior concrete with R-19.5 rigid+R9.75 in l-5/8" grade R-10 R-19.5(<0.04%) Yes U-0.041 272 <br /> Does assanbly include insulated wall furring?:Yea Wall Furring Material:Steel-fame <br /> Framing Depth:Other Framing Depth Other Framing Depth:1.5 <br /> Framing Spacing(OC):24" U-Factor Smote:ASHRAE 90.1 Appendix A Key Plan <br /> U-Factor Source Description:Appendix A component/assembly calculation(see detail sheet M0.05) New,upgraded or unaltered existing?:Upgraded existing assembly <br /> Mass(precast concrete)- W3-exterior concede R-11 blow in+R-13 in 2x4 stud plus R13 Exterior&above <br /> Commercial M0.05 rigid z-forted grade R-13 R-11(<0.04%) Yes U-0.037 149 <br /> Does assembly include insulated ,It fiurmg?:Yes Wall Furring Material:Steel-frame <br /> Framing Depth:2.4 Other Framing Depth: <br /> Framing Spacing(OC):16 U-Factor Source:WSEC Appendix A Default <br /> U-Factor Source Descri tics:Appendix A component/assembly calculation(see detail sheet M0.05) New,upgraded or unaltered existing?,Upgraded existing assembly <br /> Slab-on-grade Floors Location in Assembly ID Assembly Location Slab Edge Under Slab F-Factor Perimeter <br /> Documents Length(SF) <br /> Unheated slab M0.05 I SI At grade level R-0 R-0 F-0.73 74 <br /> Slab Insulation Method:Uninsulated slab F-Factor Source:WSEC Appendix A Default <br /> F-Facmr Source Description:Uninsulated slab edge,unheated slab Table 106.1 New,upgraded or unallered existing?:Unaltered existing assembly <br /> Fenestration&Opaque Door Assemblies <br /> Insulation R-Values <br /> Opaque Doors Location in Assembly ID Assembly Location Door Insulation U-Factor Rough <br /> Documents Opening(SF) <br /> Swinging M0.05 DI&D2 Interior partition U-0.99 42 <br /> What percentage of this opaque door is glazing?:50%or less U-Factor Source:ASHRAE 90.1 Appendix A <br /> U-Factor Somce Descri lion:Entered 0.99-can't enter any values higher so went worst case for safe New,upgraded or unaltered existin?:New assembly <br /> Swinging M0.05 D2 Exterior U-0.99 21 <br /> What percentage of this opaque door is glazing?:50%or lase U-Fodor Somce:WSEC Appendix A Default <br /> U-Factor Source Description:Entered 0.99-can't enter any values higher so went worst case for safety Is this a public entrance door?:No <br /> New,upgraded or unaltered existing?:Unaltered existing assembly <br /> Revisions <br /> ProjeNEM09 Zap Energy-Lithium Lab-2021 WSEC Date Mar 11,2025 <br /> U x A Calculation COMPLIES <br /> Opaque Envelope Assemblies PROPOSED TARGET <br /> R-1'Ceilim; RoolICeiling <br /> Roof/Ceiilng Assembly ID Assembly U- Net Area(SF) U zA Assembly U- Net Area(SF) U z A <br /> Factor Factor <br /> Artie and other RI(existing ceiling with r49 ban vented above) 0.020 1,279.0 21.6 0.021 1,279.0 <br /> (t) <br /> Wan Wan <br /> Wan. Assembly ID Assembly U- Net Area(SF) U x A Assembly U- NetArea(SF) U a A <br /> factor factor <br /> Steel-framed-Commercial W 1-Interior Rl l_2x4 steel stud plus R13 rigid z-fimed 0.066 700.0 46.2 0.055 700.0 <br /> Mass(precast concrete)-Commcmial W2-exterior concrete with R-19.5 rigid+R9.75 in 1-5/8" 0.041 272.0 11.2 0.104 272.0 <br /> (1) <br /> Mass(precast concrete)-Commercial W3-exterior concrete R-11 blow in+R-13 in 2x4 stud plus R13 rigid z-furred 0.037 449.0 16.6 0.104 449.0 <br /> (1) 03/14/25 BOG PERMIT RESPONSE <br /> Slab on Grade F1-4E PROPOSED TARGET <br /> 02/11/25 BDG CD SET <br /> Slabon-grade Floors Assembly ID F-Factor Perimeter Length UxA F-Factor Perimeter Length UaA O1 13 25 BDG ISSUE FOR PERMIT <br /> (LF) (LF) / / <br /> Unheated slab St 0.73 74.0 0.54 ��� No. Date By Description <br /> -111116 Fenestration Assemblies PROPOSED TARGET <br /> Opaque Doors Assembly ID A.Door <br /> U- 'Assembly Rough U x A Assembly U- Assembly Rough U.A Design Team <br /> Factor Opening(SF) Factor Opening(SF) <br /> Swinging DI&D2 0.99 42.0 41.6 0.37 42.0 Design BDG <br /> (l) <br /> Swinging D2 0.99 21.0 ,-x 0.37 Drawn DPM <br /> Proposed Area Proposed UaA Tugct Area Target UaA Target UaA with AdjustmentChecked DTN <br /> Project Totals 2,837 216 2,837 204 1 224 Pre Construction Number 21-25-27063 <br /> NOTE:Change in space conditioning or occupancy allowance applied-1.10 multiplier has been applied m the Tel,]Target UxA for exterior areas only.Refer m Target UxA with Adjustmenl. <br /> Construction Number <br /> Pr Zap Energy-Lithium Lab-2021 WSEC Date I Mar 11,2025 Issue Date 01/13/25 <br /> SHGC x A Calculation COMPLIES <br /> Proposed Area Proposed SHGC zA Target Area Target SHGC xA <br /> Project Totals 0 <br /> ENVELOPE <br /> COMPLIANCE <br /> - HVAC <br /> SHEET ADDED TO SET <br /> FOR CITY USE <br /> City of Everett Permit Services M 0 .0 6 <br /> EVERETT Reviewed for Permit 05/09/2025 <br />