Laserfiche WebLink
f� <br /> CITY OF EVERETT <br /> OFFICE USE ONLY <br /> EVERETT Permit Services Transmittal Date Received Stamp <br /> WASHINGTON <br /> PERM IT/PROJ ECT#: B2505-013 <br /> SITE ADDRESS: 2300 Merrill Creek Parkway <br /> PROJECT NAME: Zap Energy SE Corner Room Insulation Upgrades <br /> FROM: Jonathan Chow COMPANY: Lease Crutcher Lewis ❑Chronology—Permit Counter Transmittal <br /> ❑Plan Review Routing <br /> PHONE#: 808-896-0522 EMAIL: Location: []File []Reviewer Office <br /> Date Logged: By: <br /> Route to: (Check all that apply) Name of Reviewer Type of Review <br /> ❑ Planning Reviewer Name: ✓❑ Re-Review <br /> ❑ Public Works Reviewer Name: ❑ Revisions After Approval <br /> ✓❑ Building Reviewer Name: Lisa Roma ❑ Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> ❑ Other Reviewer Name: ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> 3 Architectural/Building Plans Geotechnical Report Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> Civil Plans _ SWPPP Report _ Recorded Easement <br /> 1 Site Plan Wetland Report Height Survey <br /> Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> Elevations Structural Calculations Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant-Other <br /> Special Inspection Report Plumbing Calculations _ Performance Guarantee <br /> As-Builts Other _ Warranty Bond <br /> Plat Maps _ Other _ Other <br /> Original City Redlines Returned _ Other _ Other <br /> Other _ Other _ Other <br /> Other Other Other <br /> Items submitted are: <br /> Complete Plan Set Replacement ❑Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Commercial alterations plans submittal. Revised Description of Work: <br /> Includes site plan, building plan, and N/A <br /> insulation upgrades details. <br /> Revised Valuation: <br /> Signed: Date: 5/7/2025 <br />