Laserfiche WebLink
16 18 14 13 12 11 10 8 8 7 6 S 4 3 2 1 <br /> ELEVATION NOTES <br /> 1. PROVIDE DOWNSPOUTS AND GUTTERS FOR ALL SLOPED ROOF L <br /> L <br /> AREAS.CONNECT TO STORM DETENTION SYSTEM <br /> 2. ALL EXTERIOR SURFACES TO RECEIVE PAINT(SEE EXTERIOR <br /> MATERIAL SCHEDULE)SHALL RECEIVE 1 COAT OF ACRYLIC LATEX <br /> 3 PRIMER AND(2)COATS OF ACRYLIC LATEX FINISH.BACK PRIME <br /> ALL EXTERIOR WOOD TRIM PIECES. <br /> 3. SEE ROOF PLAN FOR TYPICAL ARCHITECTURAL ROOF DETAILS <br /> 3 4. SEE ENCLOSURE TESTING AND INSPECTION AGENCIES DETAILS I�L <br /> FOR ADDITIONAL REQUIREMENTS <br /> 5. PAINTER TO BID PROJECT TO INCLUDE(2)DISTINCT COLORS FOR <br /> 6 ALL WALL SURFACE AREAS AND POSSIBLE 3RD DISTINCT TRIM UJ= <br /> COLOR CONFIRM FINAL COLOR SCHEME WITH OWNER V g <br /> 6. ALL EXPOSED METAL VENTS TO BE PRIME PAINTED AND FINISHED K w i2 <br /> COATED WITH TWO COATS OF ENAMEL.ALL GUTTERS AND <br /> K To of Plate To of Plate DOWNSPOUTS TO BE FACTORY FINISHED ZO O <br /> �— ————————————— ——— — — 8'_O" 7. FOR HOSE BIBB PENETRATIONS THROUGH EXTERIOR WALLS SEE'r <br /> — ------- -- ---- o � — 8'_0" ulm <br /> 0 o HOSE BIBB PLAN-A1.00 <br /> 6 8. FOR ALL EXTERIOR WALL MOUNTED BUILDING LIGHTS SEE <br /> m o EXTERIOR LIGHT PLAN-A1.00 <br /> 't9 9. DOOR GARAGE BY MANUFACTURER. <br /> 1 10.FOR OPERABLE WINDOWS SEE WINDOW SCHEDULE. <br /> 1 m 11.SEE DOOR DETAIL-A9.10 <br /> 11 <br /> 10 <br /> J 2 � J <br /> p�I <br /> —MainLe)tel _____—_—_— _—_—_—_— _ _Main Level m <br /> — — — — — — — — — — — Sim — — — ,�o — — — — — — — — — — — — — — — — Average <br /> lzi <br /> Average Grade 5 Sim Grade <br /> 52.00 - <br /> ALL FTG TO BE CONT.PER 403.1 52.00 ALL FTG TO BE CONT.PER R403.1 <br /> O NORTH-Garage O EAST-Garage <br /> I <br /> I <br /> N <br /> Max Bldg.Ht.From Max.Bldg.Ht.From .0 <br /> _—___—_—_— ToeofTheEaves __ _---------_---_— —_ ---_—_---T01�ofThe vv0' w 3 <br /> —-—-—-—-—-—-—-—- 28,_0„ <br /> U F <br /> Z r <br /> W W <br /> O 0: <br /> H UU <br /> W <br /> N <br /> ~ W <br /> = W <br /> J D: <br /> Q F- <br /> N <br /> W ~ <br /> O Z <br /> � Z <br /> Q <br /> G o <br /> G <br /> 3 <br /> 6 <br /> 3 <br /> 6 O <br /> F u <br /> F Top Of Plate , u <br /> To-oofPlate —_----- _ - <br /> ----- ---- ------------- - g'_0" o — 8'_0" y <br /> 0< ~V E <br /> 9 m V ace `m <br /> 10 c� N C <br /> w <br /> 4 n <br /> 1 _ 9 1 w <br /> _ m FZ�J vi <br /> 2 to <br /> 2 _Z W n <br /> 2 Q <br /> E <br /> Q A <br /> Main Level _ Main Level J 3 <br /> -—-—-—- - - - -—-— - - <br /> 0'_0" 0'_0" °C0. ImB <br /> Sim <br /> ALL FTG TO BE CONT.PER R403.1 <br /> Average Grade -3— — — — J < m <br /> 52.00 Average Grade m N <br /> — S2 00 A9.10 R\\ <br /> ALL FTG.TO BE CONT.PER R403.1 <br /> 0 0 <br /> 0 0 <br /> N rp <br /> O SOUTH-Garage O WEST-Garage D <br /> ci <br /> PERMIT APPROVAL STAMPS ci <br /> 0 <br /> N <br /> F <br /> TRUSS BY MFR. - <br /> TRUSS BY MFR. <br /> DOUBLE CF <br /> 3 TOP PLATE _ a <br /> C H <br /> C '3 <br /> DOUBLE cLL <br /> TOP PLATE <br /> 4¢ <br /> Top of Plate _ Top of Plate <br /> 8'-O" TT�EXTERIOR 8'-0„ <br /> PROJ.NO: <br /> 22031 <br /> TYR EXTERI R PERMIT <br /> WALL b 7 B <br /> B S2.00 - DRAWN BY:RBC <br /> CHECKED BY:MJG <br /> ISSUE DATE:0310312023 <br /> SCALE:114"=1'.0" <br /> Ill Main Level <br /> Main Level —-—- _ - <br /> -0 <br /> ELEVATION in <br /> I—I It 11—III—III_III_III—III—III—III—III—III—III—III—I 1— —_1—( I I—III—III—III—III—III—III—III—III—III—III—I A <br /> N <br /> GARAGE-Section 1 A5.01 <br /> © GARAGE-Section 2 O 18"x12"DRAWINGS ARE7/2 SIZE SCALE NOTED <br /> I/4"=1'-0" I/4„=vz- <br /> M <br /> 18 15 14 13 12 11 10 9 8 7 6 8 4 IF LINE DOES NOT MEASURE 1"SHEET IS NOT TO SCALE <br /> IF ANY DISCREPENCIES ARE FOUND,NOTIFY ARCHITECT IMMEDIATELY.VERIFY CONDITIONS AND DIMENSIONS IN FIELD. <br />