Laserfiche WebLink
i <br /> Once the permit is approved, paid for, and issued,then an inspection is required. Most of the <br /> time, our plumbing inspectors are available the next business day, so you should not need to <br /> wait long for an inspection once the permit is obtained. <br /> Since the application lists the tenant as the contractor performing the work,we do require <br /> confirmation from the owner of the property, or their representative,that the tenant is allowed to <br /> perform the work described in the permit application.This confirmation can be an email or a <br /> typed letter on letterhead. <br /> I <br /> hope this helps clarify our procedures.Thanks again for your patience. <br /> Take care, <br /> I <br /> Audrey Arbow(she/her) <br /> Permit Technician I Permit Services <br /> EVERETT �•� ` 425.257.8810 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> Phone Hours: M—F: 8:30 a.m.—12 p.m. &1 p.m.—3 p.m. <br /> everettwa.gov/permits I onlinepermits.everettwa.gov I Facebook I Twitter <br /> I <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure <br /> pursuant to the Public Records Act. <br /> Category 2:For official use only/disclosure permissible by law. <br /> From: Erik Andresen <erik@pnwbc.com> <br /> Sent: Wednesday, February 12, 2025 2:58 PM <br /> To: Lisa Roma <LRoma@everettwa.gov>; Patrick Bybee <patrickb@suhrco.com> <br /> Cc:Tyler Chism <TChism@everettwa.gov> <br />