Laserfiche WebLink
Good morning, Sabrina. <br /> Is there an update next steps for my plumbing permit? What, if any, additional <br /> documentation do I need to submit for it? <br /> Thanks, <br /> Erik <br /> -----Original message----- <br /> From: Erik Andresen <br /> Sent: Thursday, February 13 2025, 12:16 pm <br /> To: Sabrina Good <SGoodPeverettwa.gov> <br /> Cc: Permit Services <PermitServices0beverettwa.gov>;Tyler Chism <br /> <TChismPeverettwa.gov>; Cindy Bergsma <CBergsma everettwa.gov> <br /> Subject: RE: [EXTERNAL] RE: P2502-024 909 SE EVERETT MALL WAY UNIT D440 - <br /> incomplete application, plan review required &owner clarification <br /> Good Afternoon, Sabrina. <br /> So, I need to provide the following documentation even though three of them do not <br /> apply to my business or the work I did to move our 3-basin sink? To ensure there is no <br /> additional delays with my "incomplete application", what else do I need to provide now <br /> to ensure the process is completed as timely as possible? <br /> DOCUMENT TYPES: <br /> • Floor Plans (same as required by Snohomish Health District) <br /> o I have one that has already been submitted to the Washington State Liquor <br /> and Cannabis Board and Snohomish Health Department with no concerns <br /> from them and really shows nothing related to modifications. <br /> • Complete menu (same as required by Snohomish Health District) <br /> o As we do not serve food, we do not have a menu and one was not required by <br /> I the Snohomish Health District. <br /> • Equipment list for all food service equipment with includes manufacturer's names <br /> and model numbers. Equipment shall be located and labeled on the construction <br /> plans (same as required by Snohomish Health District). <br /> o As we do not serve food, we do not have "food service equipment" in our <br /> business; however, I can provide a list of taproom existing equipment that <br /> has not changed since the initial installation and permit approval. <br />