Laserfiche WebLink
0 Nom 1 30HIV Se <br /> WA3N��'•'v <br /> irnris eAN oaesxmNe+.sur�r z ^Om <br /> STATEMENT OF SPECIAL INSPECTION NOTES: xsHONAxwo sxorroscue 3' =o <br /> �q� <br /> GENERAL•SPECIAL INSPECTIONS F�0 URALZ ���` o <br /> 1. AN INDEPENDENT TESTING LABORATORY,SELECTED AND ENGAGED BY THE OWNER,SHALL PROVIDE SPECIAL INSPECTIONS IN CODE OR FREQUENCY(NOTES) <br /> SYSTEM OR MATERIAL WA CODE STANDARD REMARKS ��rONAL ENO yti <br /> ACCORDANCE WITH CHAPTER 17 OF THE IBC AND OF THE TYPE AND FREQUENCY OUTLINED IN THE QUALITY CONTROL SECTION OF oti, <br /> THESE GENERAL NOTES.SPECIAL INSPECTIONS SHALL CONFORM TO SECTION 1705 OF THE 2021 IBC,CONTRACT DOCUMENTS AND REFERENCE REFERENCE CONTINUOUS PERIODIC w <br /> APPROVED SUBMITTALS.REFER TO SPECIAL INSPECTION AND TESTING TABLES FOR PROJECT REQUIREMENTS. FS <br /> 2. W <br /> SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED ACCREDITED INDEPENDENT AGENCY CERTIFICATES OF COMPLIANCE,REPORTS OF iv <br /> MEETING THE REQUIREMENTS OF ASTM E329(MATERIALS),AND REGISTED IN THE WABO SPECIAL INSPECTION REGISTRATION SUBMITTALS TO THE BUILDING OFFICIAL 1704.5 X P M MATERIAL PROPERTIES SHALL RE-CONSTRUCTION TESTS,OR REPORTS OF BE SUBMITTED = N a <br /> PROGRAM PER WABO STANDARD 1701. THE INSPECTION AND TESTING AGENCY SHALL FURNISH TO THE STRUCTURAL ENGINEER A TO THE BUILDING OFFICIAL. <br /> COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE APPROVED BY THE BUILDING OFFICIAL. WELDING w R <br /> INSPECTORS SHALL BE QUALIFIED PER SECTION 6.1.4.1(1)OF AWS 01.1. POST INSTALLED MECHANICAL ANCHORS AND ADHESIVE 9 X st e m <br /> ANCHORS IN HARDENED CONCRETE y r X3 <br /> 3. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION ot m~ <br /> DOCUMENTS.ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN CONCRETE-SPECIAL INSPECTIONS 5 <br /> THE INSPECTION REPORTS. IBC CODE CODE OR WA FREQUENCY(NOTE s) am ke <br /> 4. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL,STRUCTURAL SYSTEM OR MATERIAL REFERENCE STANDARD REMARKS O >_ 3:: N <br /> ENGINEER,CONTRACTOR,AND OWNER. THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A FINAL REPORT STATING THAT THE REFERENCE CONTINUOUS PERIODIC Z w .U3 in <br /> rn <br /> WORK REQUIRING SPECIAL INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION z <br /> DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN CORRECTED. Lu <br /> Z H 3 <br /> V � n <br /> 5. THE CONTRACTOR SHALL MAKE AVAILABLE ALL MEANS AND METHODS NECESSARY FOR THE SPECIAL INSPECTOR TO PERFORM THE SPECIAL INSPECTIONS OF CONCRETE SHALL `"w <br /> REQUIRED INSPECTIONS. IN ADDITION,THE CONTRACTOR SHALL NOTIFY THE OWNER AND SPECIAL INSPECTOR A MINIMUM OF 48 <br /> GENERAL ACI318:26.13 1705.3 1901.E CONFOR 1705.3 OF THE IBC AND SECTION 26.13 OF ACI MTO THE REQUIREMENTS OF SECTION = w <br /> W <br /> HOURS BEFORE THE TIME AT WHICH THE SPECIFIED SPECIAL INSPECTIONS MAYBE PERFORMED. 318. <br /> 6. INSPECTION TYPES: Q <br /> CONTINUOUS:THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR <br /> WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. INSPECT REINFORCEMENT AND VERIFY PLACEMENT Table 1705.3 ACI318:CH.20,25.2,25.3, X REINFORCING TO COMPLY WITH ALL CODE <br /> PERIODIC:THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL 1901.5 225.2,2 z <br /> .6.3 PROTECTION,SPACING AND TOLERANCE LIMITS. <br /> INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF THE Table 1705.3 <br /> WORK. ACI318:CH.19, C <br /> LLJ <br /> OBSERVE:OBSERVE THESE FUNCTIONS ON A RANDOM,DAILY BASIS.OPERATIONS NEED NOT BE DELAYED PENDING OBSERVATIONS. VERIFYING USE OF REQUIRED MIX DESIGNS) 1904. X G <br /> 26.4.3,26.4.4 <br /> PERFORM:INSPECTIONS SHALL BE PERFORMED PRIOR TO THE FINAL ACCEPTANCE OF THE ITEM. 1904.2 � <br /> CONCRETE SPECIMENS FOR TESTING Table 1705.3 ASTM C31 X CONCRETE SPECIMENS FOR TESTING.SEE THE M <br /> ASTM C172 PRIOR TO CONCRETE PLACEMENT,FABRICATE <br /> 7. PERFORM INSPECTION PRIOR TO FINALACCEPTANCE OF THE ITEM FOR TEN WELDS TO BE MADE BY A GIVEN WELDER,WITH THE AC1318:26.5, CONCRETE TESTING TABLE FOR ADDITIONAL <br /> WELDER DEMONSTRATING UNDERSTANDING OF REQUIREMENTS AND POSSESSION OF SKILLS AND TOOLS TO VERIFY THESE ITEMS, 26.12 INFORMATION. LLJ <br /> THE PERFORM DESIGNATION OF THIS TASK SHALL BE REDUCED TO OBSERVE,AND THE WELDER SHALL PERFORM THIS TASK. ACI 318:26.5, <br /> SHOULD THE INSPECTOR DETERMINE THATTHE WELDER HAS DISCONTINUED PERFORMANCE OF THIS TASK,THE TASK SHALL BE CONCRETE PLACEMENT Table 1705.3 26.13.3.2 a X (/) <br /> RETURNED TO PERFORM UNTIL SUCH TIME AS THE INSPECTOR HAS RE-ESTABLISHED ADEQUATE ASSURANCE THAT THE WELDER CONCRETE CURING Table 1705.3 ACI 318:26.5.3- X VERIFY MAINTENANCE OF SPECIFIED CURING (/) <br /> WILL PERFORM THE INSPECTION TASKS LISTED. 26.5.5 TEMPERATURES AND TECHNIQUES Li j <br /> 8. SPECIAL INSPECTION OF MECHANICAL POST INSTALLED ANCHORS SHALL BE IN STRICT CONFORMANCE WITH THE(CC REPORT AND ACI 318: SPECIAL INSPECTIONS APPLY TO SHAPE, O <br /> MANUFACTURER'S INSTALLATION REQUIREMENTS.ANCHOR INSTALLERS SHALL BE QUALIFIED AS REQUIRED BY JURISDICTION VERIFICATION OF FORMWORK Table 1705.3 26.11.1.2(b), X LOCATION AND DIMENSIONS OF THE CONCRETE <br /> REQUIREMENTS. cli <br /> 28.13.3.3 MEMBER BEING FORKED CD <br /> 8.1. INSPECTION REPORTS SHALL IDENTIFY NAMES OF INSTALLERS. 0- <br /> I uCo <br /> 8.2. SPECIAL INSPECTOR SHALL PROVIDE DOCUMENTATION AT THE END OF ANCHOR INSTALLATIONS STATING THAT THE ANCHORS CONCRETE-TESTING z COP `r' 3: <br /> WERE INSPECTED PER APPROVED ANCHOR EVALUATION REPORT. U <br /> J w w <br /> 9. QUALITY ASSURANCE(QA)IS REQUIRED FOR STRUCTURAL STEEL ITEMS PER AISC 360 AND 341 UNLESS SPECIFICALLY NOTED WAIBC CODE CODE OR W O W <br /> OTHERWISE.QUALITY CONTROL(QC)TO BE PROVIDED BY THE FABRICATOR,ERECTOR OR OTHER RESPONSIBLE CONTRACTOR AS SYSTEM OR MATERIAL REFERENCE STANDARD FREQUENCY(NOTE 6) REMARKS = a v a!APPLICABLE.CONTRACTOR AND SPECIAL INSPECTOR TO DOCUMENT QUALITY CONTROL AS REQUIRED IN AISC 360 SECTION N3 AND REFERENCE <br /> AISC 341 SECTION J2. <br /> CONTRACTOR RESPONSIBILITY: CONCRETE STRENGTH 1705.3 ASTM C39 <br /> EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE MAIN VIAND-OR SEISMIC-FORCE-RESISTING SYSTEM,DESIGNATED CONCRETE SLUM ASTM C172 EACH 150 CY NOR LESS THAN SLUMP ASTM C31 ASTM C143 EACH 5000 SF OF SLAB OR FABRICATE SPECIMENS AT TIME FRESH <br /> CONCRETE IS PLACED <br /> SEISMIC SYSTEM OR A WIND-OR SEISMIC-RESISTING COMPONENT LISTED THE TABLES SHALL SUBMITA WRITTEN STATEMENT OF CONCRETE AIR CONTENT ACI 318 26.12, ASTM C231 WALL PLACED EACH SHIFT Q <br /> RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. ACI 318 26.5 U <br /> THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN THE FOLLOWING: CONCRETE TEMPERATURE ASTM C10M <br /> ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. 02-0 M <br /> (3) #5x F Z <br /> 1. ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS a Q <br /> APPROVED BY THE BUILDING OFFICIAL. z <br /> 2. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION,THE METHOD AND FREQUENCY OF 0 <br /> REPORTING AND DISTRIBUTION OF THE REPORTS. <br /> U <br /> o LLJ <br /> 3. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S)EXERCISING SUCH CONTROL AND THEIR POSITION(S)IN THE <br /> r__j <br /> ORGANIZATION. THICKENED EDGE BEYOND NOTE:DETAIL IS SCHEMATIC U <br /> TO REPRESENT EMBEDMENT Z <br /> a DEPTHS OF ANCHOR TYPES a Q J <br /> - - o U Q <br /> #5 BARS AT 12" O.C. " LLI H <br /> EACH WAY, CENTERED IN PLATE WASHERS-CIRCULAR OR a W <br /> SLAB SQUARE PLATE WASHERS MEETING THE H <br /> � BASE PLATE <br /> SPECIFIED SIZE ARE ACCEPTABLE <br /> JOB N.. <br /> T 2405-0007 <br /> EMBEDMENT a DRAWN CHECKED <br /> Tic NRW <br /> DATE 02/25/2025 <br /> y� REVISIONS <br /> F <br /> TYPICAL FOUNDATION CORNER DETAIL , TYPICAL ANCHORAGE DETAIL 2 SHEET <br /> 1^ = 1'-0" S2 „ = 1'-o" S2 <br /> o S2 OF 3 <br /> 21282025 4:08:08 PM <br />