Laserfiche WebLink
SHEAR ALL SCHEDULE <br /> PER ISG 21016 DATE: 01-08-16 <br /> SEE PLANS TO DETERMINE THE DIFFERENT DE515NATOR5 FOR SHEAR WALL MATERIALS, <br /> NAILING,ANCHOR BOLTS, AND HOLDOWN5. LOCATE HOLDOW45 AS CLOSE A5 P055I5LE TO THE END <br /> OF THE DESIGNATED WALL. <br /> ALL HOLDOWNS, ANCHOR BOLTS, WASHERS, 4 NAILS IN CONTACT WITH P.T. WOOD TO BE <br /> HOT DIPPED GALVANIZED. <br /> PI = ONE 51DE PLYWOOD <br /> P2 = TWO SIDES PLYWOOD <br /> NAIL SPACI SILL <br /> NG HF#2 DF#2 <br /> i ?/Ib" BASE <br /> MARK f PLYWD. �5 FIELD TOP <br /> RE G!p. PLATE PLATE VALUE VALUE <br /> ANCHOR BOLTS NAILING (#/LF) NAX) <br /> PI-6" 8d b" 12" 6" 2x4 5/8" a 48" (2) Ibd 0 10" 225 255 <br /> PI-4" 8d 4' 12" _ 4" 2x4 5/8" ® 32" (2) 16d ® "►" 325 3q5 <br /> PI-3" we I 8d 3" 12" 3" 3x4 <br /> /8 24 (2) !6d a 5" 415 5o5 <br /> PI-2" 8d 2" 12" 2" 3x4 3/4" ® 24" (2) [rod 0 5" 544 670 <br /> b" 12" 6" 3x4 5/8" ® 24" (2) Ibd a 5" 446 510 <br /> P2-4" •* at, # 4" 12" 4" 3x4 3/4" 20" (3) Ibd 5" 650 7qO <br /> P2-3" �* r 8d 3" 12" 3" 3x4 5/4" Q 16" (4) Ibd a 5" 536 1010 <br /> P2-2" 8d 2" 12" 2" 3x4 5/4" Q 12" (4) Mod 0 4" 1088 1170 <br /> *NOTE: WALLS WITH UNIT SHEAR OF 351#/ft. OR GREATER SHALL HAVE FRAMING MEMBERS (STUDS 4: PLATES) <br /> ABUTTING PANELS NOT LESS THAN 3X MEMBER5(PER IBC 2018 TABLE 230(o.3) OR <br /> DOUBLE 2x (PER IBC 2018 - SEGTION 23063 footnote 0. 3X FRAMING WILL BE NOTED ON PLAN. <br /> MUD5ILL DO NOT NEED TO BE 3X MATERIAL JUST STUDS AND PLATES ON ADJOINING PANEL E26E5 <br /> "NOTE: HEM-FIR VALUES HAVE BEEN ADJUSTED AGGORING TO 15G TABLE 2506-5 Footnote a.(3) <br /> SPECIFIC GRAVITY ADJUSTMENT FACTOR = [1405-56)];55 FOR HEM-FIR = .45 PER AFBPA; [1-(05-.43)1 = .q3 <br /> I. USE POWER-DRIVEN STEED_ STUDS AND NAILS BY HILTY OR RAM5ET WHERE APPLICABLE. <br /> 2. PLYWOOD MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. <br /> 3. SOLID BLOCK WITH JO15T UNDER INTERIOR SHEAR WALLS. <br /> SHEAR HALL NOTES <br /> 7/I6" 055 OR PLYWOOD SHEATHING - USE 8d COMMON OR GALVANIZED NAILS. BLOCK ALL PANEL <br /> EDGES. LONG DIMENSIONS OF PLYWOOD MAY BE INSTALLED VERTICALLY. NAIL a 12" O.G. TO ALL <br /> INTERMEDIATE STUDS. WHERE 3" NAIL SPACING 15 SPECIFIED AT PANEL EDGES,USE I-{/2" 8d <br /> SHORT NAILS OR 3X 5TUD5 WITH IOd COMMON NAILS. FOR 2" NAIL SPACING, USE 3X STUDS <br /> AND STAGGER PANELS. WHERE PLYWOOD 15 2 51DE5 OF WALL, JOINT5 TO FALL ON <br /> SEPARATE STUDS ON EACH SIDE. <br /> FLOOR PLYWOOD -USE 8d COMMON NAILS a 10" O.G. AT INTERMEDIATE SUPPORTS,6" O.G. <br /> AT ALL PANEL EDGES AND 4" O.G. AT ALL SHEAR WALLS,UNLESS OTHERK15E SHOWN ON PLANS. <br /> FLOOR JOISTS - JOIST PARRALLEL TO FLOOR OPENINGS AND EXTERIOR WALLS SHALL BE <br /> CRO55 BLOCKED AT 46" O.G. 0 EDGE5 W/ (4) IOd NAILS FOR THE FIRST BAY. <br /> 3" x 3" x 1/4" SQUARE WA5HER5 AT ALL ANCHOR BOLTS. <br /> STAPLE SCHEDULE <br /> 7/I6" 0513 OR PLYWOOD SHEATHING <br /> ALLOWABLE SHEAR VALUES <br /> 112 16 gage STAPLES - DF #2 STUDS 1112 16 gage STAPLES - HF #2 STUDS <br /> 6" oz. - 155#/Ft. 6" oz. - 127 #/ft. <br /> 4" c.c. - 230 #/ft. 4" oz. - I88 #/ ft. <br /> 3" oz. - 310 #/ft. 3" 04. - 254 #/ft. <br /> 2" oz. - 3q5 #/ft. 2" oz. -- 325 #/ft. <br /> FIELD 51PAGING: 12" O.G. NAILS 4 STAPLES. <br /> HOLDOWN5 - INSTALL SIMPSON HOLDOWN5 OR EQUIVALENT AT THE END OF SHEAR WALLS <br /> WHEN SHOWN ON DRAWINGS. TO ATTACH USE 2X OR 3X HF #2 GONSTRUGTION 6RADE5 A5 <br /> SHEAR WALL BOUNDARY ELEMENTS. HOLDOWNS ARE ONLY REQUIRED WHERE SHOWN ON PLANS. <br />