My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 100TH ST SW 2022 Plans 2025-11-07 (2)
>
Address Records
>
100TH ST SW
>
1720
>
Plans
>
1720 100TH ST SW 2022 Plans 2025-11-07 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 11:30:41 AM
Creation date
11/7/2025 11:30:09 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1720
Permit
B2207-091
Year
2022
Notes
NEW SFR & DRIVEWAY - LOT A, EAST HOUSE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NASH 0. <br /> A550G I ATES <br /> ,ol. GENERAL NOTES <br /> I.All construction per applicable codes and ordinances. <br /> HANDRAIL 2015 IRG,IBG. <br /> I ERSON <br /> GRIP II<'-2.0 RTEOF Wp9HINOTON <br /> PROJECTION FROM 2.Verify ail dimensions on fob site.Bring discrepancies <br /> arm F�w�.LL WALL NO LESS NO51N5 to M attention of Owner and/or Designer. <br /> THAN I16'. <br /> STAIRWAY ILLUMINATION, 11 3.Owner Mil V I Mndow 5IZe5 and anufa turer(s)With <br /> OPEN RAIL 1 11 framer before 5ta^t of construc mtion. <br /> I. PROVILF 1-1—STAIRWAYS WTH AN ARTFICIAL OPEN SPACE BETI ii 11 II <br /> LIGHT Sg1RCE LOCATED IN TE IMMEDIATE PICKETS SHALL BE II II 4,One window per bedroom shall meet egre55 code. <br /> VICINITY OF EAGN LANDING OF TE STAIRWAY, LESS THAN 4"CLEAR 11 I1 11 11 <br /> CAPPBLE OF ILLUMINATING TREnns AND LANDINGS u 5.Skylight glazing per 201b RG, <br /> To Ll Y NOT LESS THAN I FOOT-CANDLES STAIR NOTES: ' <br /> SIMP50N JB210 rEA511RED AT TIE CE_OF TREADS PND RISER HEIGHT=T-5/4'MAX. 11 11 / b.and mCTVfgctUrBr Shall Supply shop dfaWings t0 owner <br /> OR EGTUAL FOR LANDINGS. TREAD DEPTH=10'MIN. `� II and framer to revuB and a before fabrication. <br /> 51N S JOISTS 1L HANGER PPr�' <br /> OMPSON WNP210-2 2.PROVIDE EC'TERIOR STAIRWAYS WITH AN ARTIFICIAL ` <br /> OR EQUAL FOR LIGHT SOURCE LOCATE)IN THE IMMEDIATE 2X4 STOP 5-242 '!.Owner WIII verify Installation. <br /> and heat layouts with <br /> VICINITY OF TIE TOP LANDING OF THE STAIRWAY. 2 2XI5 HEADB2 Installer before installaton.DOUBLE JOISTS STRINGERS w <br /> 3.THE RO 1-1L FOR ACTVAT lO GF 1TE INTERIOR FLOOR JOIST b.Under oil II bearingWg115,use double Its Or a5 <br /> GRAWLSPAGE STAIRWAY LIGHTING SHALL BE ACCESSIBLE AT 2XB O 16'O,C. 2X4 BLOCKING noted on plan. Double�lst or extra TJU under all non- F TE TOP ANp BOTTOM OF EACH STAIRWAY <br /> WITHOUT TRAVE251N6 ANY STEPS. MREBLOCK 5TAIR5: (FIREarOP) bearing Parallel watts. QI' <br /> REFER TO PLANS AND SHEET 61 4.TIE ILUMI-TIout OF EMEWOR STAIRWAYS SHALL ONCE IN TOP<BOTfoM FIRB?I.00KS <br /> FOR FOOTING SIZE AND REINFORCING M CONTROLLED FROM INSIDE THE DYELLINS UNIT OF FIN SETVEEN 5TRIN56i5 \ 9.TJI products to be installed per monufacturer'S <br /> oR AUTOMATCALLY CONTROLLED. <ALONG RUN BETVEB(STUDS \ installation guide and approved reports. O <br /> JOIST HUNG OFP WALL USABLE SPACE UNDER STAIRS \ 10.All metal connectfom to treated Woad shall be at a 'ZZ <br /> TO I HR FIRE(.ONSTPo)CTION \ DIP GalvanlPze lASTM le Zinc AX(6105 onne ors 65 ;Hot <br /> rYPE'W 6Y48.(TWO LAYERS for f—M il-and M A125). <br /> AT STAIR CEILING) <br /> ALL BATH ROOM FANS,KITCHEN HOOD, II.Manufacture Installationr's Stallation Instructlon5 Shall be <br /> AND DRYER DUCTS SHALL BE - s-o°eoTH BIB .pliable on the job site at the time of Irepec 1' <br /> EXHAUSTED THRU THE ATTIC TO for the In=tors Use and reference. RevfSed <br /> THE ROOF OR THRU THE FLOOR TYP I GAL STAIR DETAIL drawings shall be rBwbmitted far reviews. <br /> SY57EM TO AN OUTSIDE WALL. <br /> ALL WALL DUGT5 SHALL TERMINATE 8005 115TH <br /> AT LEAST 56"FROM A WINDOW OPENING. AVE AI'�. <br /> 24"CARDBOARD BAFFLE DESIGN DATA Kirkland <br /> ALLOW FOR P AIR SPACE <br /> MIN.EXTEND 12"ABOVE BETWEEN TOP OF ROOP LOADS, LL 25#/SF(SNOW) 98055 <br /> INSULATION. ROOFING MATERIAL <br /> FINISH PER ELEVATION BAFFLE AND TOP OF DL I5#/SF <br /> 2X BIRD BLK'G.W/ ON T/Ib"OBS SOLID GDX 24-0 PLYWOOD INSULATION. Tor40« 425) 828-41I"I <br /> 2"51-REENED VENT SHEATHING;INSTALL PER MFD. _ FLOOR LOADS, LL 4o#reF <br /> HOLES WITH 1/4" SPEGIFIGATIONS. LL ION/SF FAX <br /> GORRPSION RE515TANT (7/lb'05B AGX PLYWD®EVE5) _ roTAL 500/SF (425) 822-1918 <br /> MIN.I5#UNDERLAYNENT TYPICAL <br /> CAL O.G. <br /> METAL MESH COVERING TYPICAL® DEGIC LOADS. LL bo#/sF <br /> NAIL 6"EDGE,12"FIELD WITH <br /> T <br /> 8d NAILS UNLESS NOTED BLOCKING <br /> AI TOTAL 104ASF LL <br /> 50LID SHEATHING OTHERWISE WALL FIRE BLOCKING: SOIL. I5OO PSF MIN. O W� <br /> OR CID PLYWD. FIRE BLOGK ALL VERTICAL 2-2X TOP PLATE CONCRETE, 5000 P51 AFTER 25 DAYS <br /> I"d'E' O`-"ED 2X RAFTERS OR OPENING IN WALLS AT PLATE5 LAP CORNERS OFFSET -5000 P51 FOR EXTERIOR FOUNDATION R J TO WEATHER APPROVED TRUSSES BEARING AND FLOORS END JOINTS BY 48° —1 FORD 1 5r 1 ANv oR Z W MANUFACTURER'S SEAL. GARAGE SLABS-AIR ENTRAINMENT _ <br /> 2X FASCIA BD. SEE ROOF FRAMING PLAN EXTERIOR HEADER 15 BETVEEN 5-" (TABLE 402.2 iRC) O O I <br /> - W/TER FOR SPACING FLOOR JOISTS:SEE AT OPENIN65: MASONRY, PER 201E,IBC J F <br /> �T PLAN FOR SIZE d SEE PLAN FOR SIZE �JI d I 1) <br /> STEEL PER 2016 IBC(GRADE 60-IN)- H <br /> SPACING.DOUBLE INSl1LATION PER 2X STUDS® 5ES NOTE E`ELOW, Z W = 3 Q <br /> INSULATION PER WSEG JOISTS UNDER ALL 11J) <br /> PARALLEL WSEG Ib"O.G.TYP. FOUNDATION WALL REBAR: H <br /> PARTITIONS -1/6"O56 OR PLYN� HORIZONTAL AT 10"O.G.-GRADE 40 OKAY 0 Q Q I <br /> HTSG PLYWOOD VERTICAL AT 46"O.G. -GRADE 60 OR _ Y <br /> 2X CEILING JOISTS OR SHEATHIN6-NAIL b' VERITICAL AT 52•'O.G.-GRADE 4o OKAY Q F Y <br /> l/Ib"OSB PLYWD. BOTTOM CHORD OF TRU55 LOOR(GLUED EDGE,12"FIELD R404.133.T q p <br /> SHEATHING ILED)NAIL AT WITH 8d NAILS Z <br /> 50 D BLOGKIN6GE d 12"FIELD UNLF55 NOTED <br /> d NAILS OTHERWISE PER 2016 IE F <br /> I/2"GYPSUM WALLBOARD,Tl'P. AT ING,TYP ,` W Q O Q Vt/PVA VAPOR BARRIER 5 BRIDGING a NAILING, PER 2015 IBC NAILIN6PER TABLE v W <br /> ®WALLS AND CEILING5 .MAX.WHEN IS#FELT OVER 1 e02.5(U.R6o2.10 _ O V F. <br /> R JOIST ARE STUDS(SIDING WIND,es NIPHI MOMINAu,Ilo MPG NLTIMATEU Z Y <br /> SEE DETAIL ABOVE ON SOLID BLOCKING GROSS BRIDGING o HB. REED COND.ONLY) sElsMlc. zoNE-D J W <br /> IN THIS FOUNDATION <br /> FOR JOIST W.B. W <br /> INSIDE FOUNDATION AT BEARING,TYP. 8'O.G.MAX.WHEN BASE SHEAR=123 M Q <br /> FLOOR JOIST ARE <br /> INSULATION NOT SUPPORTED2X PLATE YEATTIERiNb POTENTIAL.MODERATE IU u N <br /> 2X P.T.SILL R-38 <br /> PLATE Vl/6.W.8.BELOW If15U�A-fESOLID RIM J5TFIN.GRADE R-21 MIN. 4"BEAM, DOU6LA5 FIR x2jTO 5LOPE ) RIM's_ 6"15EAM' fV="0 OZ <br /> VENT \ fb=900 P51 L <br /> AWAY FROM E=IgOBUILDING r bza"CARDBOARD ISHED BPSEMENT WOOD SIDING 4°POST• D U5LA5 FIR#2SA SLOPE NOT BE PART 6"Po fv2X4 GUTNEATNSEE ELEVATION/W MIN. ItS�(.. E PLANS SHEET FOR E=1,5oOpoo <br /> R rrP. EA.SIDE TYPE JOISTS<RAFTERS HEM FIR N2 rovTe <br /> -- <STUDS. fv=ISO r6V1910n5: <br /> #4 GONT.TOP P05T/BEAM STRAP fb=65O PSI <br /> > ITT=ITT=III= : GR,�. P�4GE E=I,Soo,000 <br /> d BOTTOM (SIT 0 SPLICES <br /> ICE d <br /> d M #4 VERTICAL 3/4'MIN � bbT®SPLICES OR 6Lu-LAM BEAMS, <br /> SEE F ATION ®Ib"O.G. CLEARTYP. EQUIVALENT) fb <br /> 51ZE #4 HORIZ.-O.G.SPACING pet(reduced bU elze <br /> _n .. faatar,GF�Ku 1$G 2018 <br /> = 40#FELT POST/ST1D WALL E=I,b00000 pal <br /> ®® III-III- '- � _ 51MPSON HGAMIO PER WALL WIDTH-SEE �— 20I0 <br /> Zia =�1=� ° tl OR A35 EACH DE516N DATA a RIGHT R-1 MIN. SIMPSON FU44 OR W X 0'ANCHOR <br /> BOLT VARIATIONS FROM THE ABOVE TYPICAL <br /> I SIDE OF P05T kv T AL PER POST SIZE ��Oy.NO LESS LUMBER CA AD WILL BE yW4LL <br /> Q POWDER , K PLINTH BLOCK i NO MORE THAN 12'FROM NOTED ON THE PLANS. <br /> ACTUATED NAILS _ _ �'.'. EA 51OPBIING,ANCETC j°MJOILTj. END. I.SUBFLOOR, <br /> —III III 4"GONG.SLAB ON EMBEDMENT WO GONG. TO PLYWOOD OR OSB APA RATED <br /> J 4"COURSE GRAVEL STURD-I-FLOOR IS-O.G.,3/4' <br /> 4"m D.S.TIGHTLINE u Z J L= I,.,_ - EXGEpr a STEAK wuLs.sff <br /> =III-III SHEAR WALL NAILING SGHMULE <br /> POSITIVE DRAIN f 6 m u iWHI, <br /> #4 GONE.HORZ.TOP Aw A fZ TEr�SHEEA IT1NG1 24/I6 'T/16" drawn bTO 5PLA5HBLOGK "� yOR APPROVED IQe e " ° N eheSolead.by:GN/RJ <br /> DRAINAGE l N - #4 STUB UP a 48'O.G. FOOTING FORINSU, <br /> 2:1 MAX. - - �. _ 'HOOK EXPENDED = b"WALL-b"XI2'FOOTINGb MIL BLACK'VISQUffN' SLOPE ;. III III-III WALL Ib"BELOW GRADE <br /> VAPOR BARRIER 2-#4 GONE. C DER ENTIRE10 MIN. #4 STEEL-4b'O.G.VERT. TYTPI LL L <br /> vTE <br /> 12"0...HORIZ. <br /> -. _" -.. CONT.IN FOOTING — b' WALL--I"XIb"FOOTINC5 SECTIONS <br /> #4 STUB UP SEE SEE FDN.PLA <br /> ALL FOOTINGS TO BEAR ON SCHEDULE FOR 5"MIN. FOR PAD 51ZE �_-.O Ib"$FLOW GRADE /' <br /> FIRM UNDISTURBED SOIL SPADING GLEAR - a_ - #4 STEEL- 15 O.c.H =P-T. G- <br /> 4".P PERF.FOOTING DRAIN TILE TYPICAL THIS STAMPED PLAN IS SITE SPECIFIC AND 15 TO BE USED FOR <br /> W/CLOTH COVER d GRANULAR ONE SITE ONLY. BASIC,PERMITS FOR MULTIPLE SITES ARE NOT —10"WALL-5"XIb"FOOTING <br /> COVER AS REQ'D.BY 501L COW. TYP I C.4L YNALL SECTIONS AI-LOVED N11TH THIS STAMPED PLAN WITHOUT ATTALFED 24"$FLOW GRADE <br /> WRITTEN PERMI55ION OF THE ARCHITECT OF RECORD. #4 5TEEL-45"o.G.VE W O.G.HORIZ. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.