|
GENERAL NOTES
<br /> 1. LANDSCAPE PLANTING SHALL CONFORM TO THE B A N K O F A M E R I CAL
<br /> STANDARDS ESTABLISHED BY THE CITY OF
<br /> EVERETT DEVELOPMENT CODE.
<br /> 2. ALL PLANT BEDS SHALL HAVE A 3"DEPTH OF EXTERIOR RENOVATION
<br /> TOPSOIL NOTES: BARK MULCH. 1803112th St SE
<br /> 3. LANDSCAPE AREAS SHALL BE HAND WATERED Everett,WA 98208
<br /> 1. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AN ALTERNATE NUMBER IN THE BASE BID FOR A FIVE YEAR OR FIVE SEASON(WHICHEVER
<br /> TO FURNISH AND INSTALL AMENDED TOPSOIL IN ALL LANDSCAPE BEDS AND SEEDED AREAS AS SPECIFIED BELOW IS LONGER)ESTABLISHMENT PERIOD.ALL DEAD BUILDING ID:WA4-138
<br /> UNLESS OTHERWISE NOTED.AMENDED TOPSOIL SHALL INCLUDE ALL NECESSARY FERTILIZERS,ORGANIC AND OR DYING PLANTS ARE TO BE REPLACED
<br /> INORGANIC AMENDMENTS,BASED ON INDUSTRY STANDARDS FOR EXCEPTIONAL PLANT DEVELOPMENT. IMMEDIATELY.
<br /> • SCARIFY ALL PLANTING AREA SUB-GRADE TO A DEPTH OF 6".INSTALL&TILL IN 2"LAYER OF AMENDED
<br /> TOPSOIL INTO SCARIFIED SUB-GRADE AND RE-COMPACT TO 95%' 4. ALL PLANT MATERIAL DELIVERED TO THIS SITE
<br /> • PROVIDE MIN.12"DEPTH AMENDED TOPSOIL TO ALL PLANTING AREAS. SHALL MEET THE AMERICAN STANDARD FOR
<br /> 2. IMMEDIATELY UPON BEING AWARDED THE CONTRACT,THE GENERAL CONTRACTOR SHALL COORDINATE WITH A NURSERY STOCK STANDARDS.
<br /> STATE LICENSED SOIL LABORATORY AND THE LANDSCAPE ARCHITECT,TO DETERMINE THE SUITABILITY AND CONTRACTOR SHALL OBTAIN WRITTEN
<br /> AVAILABILITY OF THE EXISTING SITE TOPSOIL.THE CONTRACTOR SHALL SEND THE RECOMMENDED TOPSOIL 5. APPROVAL FOR ALL PLANT MATERIAL Gensler
<br /> SAMPLES TO A SOIL LABORATORY FOR ANALYSIS,STATING THAT THE TOPSOIL IS TO BE ANALYZED FOR A SUBSTITUTIONS FROM THE LANDSCAPE
<br /> LANDSCAPE CROP.AFTER RECEIVING RECOMMENDATIONS FROM THE SOILS EXPERT,THE CONTRACTOR SHALL
<br /> FORWARD A COPY TO THE OWNERS REPRESENTATIVE AT WHICH TIME A DECISION WILL BE MADE BY THE OWNER ARCHITECT PRIOR TO INSTALLATION.PLANT
<br /> AS TO WHETHER OR NOT THE EXISTING ON-SITE STOCKPILE WILL BE USED FOR TOPSOIL FOR THE PROJECT. SUBSTITUTIONS WITHOUT PRIOR WRITTEN 1200 Sixth Avenue Tel 206.654.2100
<br /> APPROVAL THAT DO NOT COMPLY WITH THE Suite 500 Fax 206.654.2121
<br /> 3. IF THE EXISTING TOPSOIL IS TO BE USED THE CONTRACTOR SHALL ADD THE RECOMMENDED AMENDMENTS AND DRAWINGS AND SPECIFICATIONS MAY BE Seadle,WA 98101
<br /> FERTILIZERS AS STATED IN THE SOILS ANALYSIS ALONG WITH ADDITIONAL AMENDMENTS AND FERTILIZERS REJECTED BY THE LANDSCAPE ARCHITECT AT United States
<br /> LISTED IN NOTE#6 AND#7 BELOW. NO COST TO THE OWNER.THESE ITEMS MAY BE
<br /> REQUIRED TO BE REPLACED WITH PLANT
<br /> 4. IN THE EVENT THE EXISTING ON-SITE TOPSOIL IS OF POOR QUALITY(AS DETERMINED BY THE SOIL ANALYSIS)OR MATERIALS THAT ARE IN COMPLIANCE WITH THE
<br /> / IS UNAVAILABLE FOR USE,THE OWNER'S REPRESENTATIVE WILL MAKE A DECISION AS TO WHETHER OR NOT THE DRAWINGS. ® Stantec
<br /> ADDITIONAL COST ASSOCIATED WITH IMPORTING 9"OF AMENDED TOPSOIL WILL BE ADDED TO THE SIGNED
<br /> CONTRACT AGREEMENT. 6. CONTRACTOR SHALL RESTORE ALL LANDSCAPE
<br /> AREAS NOT ON THIS PLANTING PLAN BUT 601 SW SECOND AVE.,SUITE 1400
<br /> 5. IF AMENDED IMPORTED TOPSOIL IS TO BE USED,THE GENERAL CONTRACTOR WILL BE NOTIFIED IN WRITING BY DISTURBED BY CONSTRUCTION ACTIVITIES TO PORTLAND,OR 97204
<br /> THE OWNER'S REPRESENTATIVE AND THE CONTRACT MODIFIED ACCORDINGLY.TOPSOIL SHALL BE OBTAINED PRE-CONSTRUCTION CONDITION. 503.226.7377 stantec.com
<br /> FROM NATURALLY WELL-DRAINED SITES WHERE TOPSOIL OCCURS AT LEAST 4 INCHES DEEP.DO NOT OBTAIN
<br /> FROM BOGS OR MARSHES. IMPORTED TOPSOIL SHALL COMPLY WITH ASTM D 5268,WITH A PH RANGE OF 5.5 TO 7. EXISTING PLANT BED PREPARATION:
<br /> 7.0,FREE OF STONES 1 INCH OR LARGER IN ANY DIMENSION,AND ANY OTHER EXTRANEOUS MATERIALS(ROCKS, BARK
<br /> REMOVE ALL PLANT MATERIAL AND OLD
<br /> STICKS,RUBBISH,SOD)HARMFUL TO PLANT GROWTH.AN ADDITIONAL SOILS ANALYSIS WILL BE REQUIRED FOR A.MULCH OFF THE TOP OF PLANT BEDS TO
<br /> THE IMPORTED TOPSOIL.
<br /> \ / BRING ELEVATION DOWN TO A FINISHED
<br /> �( 6. AMENDED IMPORTED TOPSOIL SHALL INCLUDE ALL NECESSARY FERTILIZER AND AMENDMENTS PER THE SOIL GRADE AT TOP OF CURB WITH GRADES
<br /> ANALYSIS RECOMMENDATIONS.TOPSOIL ANALYSIS SHALL STATE ORGANIC MATTER,INORGANIC MATTER(SILT, SLOPING UP TO CENTER OF BED AT 2%SLOPE.
<br /> CLAY AND SAND),DELETERIOUS MATERIAL,PH,MINERAL AND PLANT-NUTRIENT CONTENT.IN ADDITION THE B.PROVIDE SOIL TEST SAMPLES TO SOIL
<br /> EQUAL REPORT SHALL ALSO STATE THE RECOMMENDED QUANTITIES(BY PERCENTAGE OF WEIGHT,I.E.2 LE S OF LABORATORY(SEE SOILS NOTES ON SHEET
<br /> 15-15-15 PER 1,000 SF)OF NITROGEN,PHOSPHORUS AND POTASH,NUTRIENTS AND ANY LIMESTONE,ALUMINUM L00.20)TO DETERMINE AMENDMENTS
<br /> SULFATE,OR OTHER SOIL AMENDMENTS TO BE ADDED TO PRODUCE A SATISFACTORY AMENDED TOPSOIL. REQUIRED.
<br /> CONTRACTOR SHALL FURNISH REPORT AND RECOMMENDATIONS TO LANDSCAPE ARCHITECT FOR REVIEW AND C.ROTOTILL SOILS,ADDING WATER AS
<br /> ALL GROUND COVER SHALL BE PLANTED AT EQUAL WRITTEN APPROVAL 30 DAYS PRIOR TO MOBILIZATION. NECESSARY AND AMENDMENTS AS DIRECTED
<br /> TRIANGULAR SPACING PER ON CENTER SPACING AS IN SOILS NOTES,SHEET 1_00.02.
<br /> SPECIFIED ON PLANTING PLAN. 7. IN ADDITION TO THE SOILS ANALYSIS RECOMMENDATIONS,THE LANDSCAPE CONTRACTOR SHALL ADD 1 PART(2"
<br /> LAYER)OF APPROVED HUMUS MATERIAL TO 2 PARTS AMENDED TOPSOIL.SUBMIT CUT SHEET OF HUMUS
<br /> LOCATE GROUND COVER ONE HALF OF SPECIFIED MATERIAL(CERTIFIED FINE COMPOSTED YARD DEBRIS)TO LANDSCAPE ARCHITECT FOR REVIEW AND WRITTEN
<br /> SPACING DISTANCE FROM ANY CURB,SIDEWALK,OR APPROVAL PRIOR TO MIXING.
<br /> OTHER HARD SURFACE,UNLESS OTHERWISE NOTED.
<br /> 8. PRIOR TO PLACEMENT OF TOPSOIL,SCARIFY AND LOOSEN SUB-GRADE OF PLANTING BED AREA TO A MINIMUM
<br /> BACKFILL WITH APPROVED TOPSOIL.AMEND TOPSOIL DEPTH OF 6 INCHES.REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS,ROOTS,RUBBISH
<br /> PER THE LAB ANALYSIS. AND OTHER EXTRANEOUS MATERIALS.REMOVE WEEDS FROM EXISTING SUB-GRADE AND TREAT WITH
<br /> NECESSARY HERBICIDE TO PREVENT WEED GROWTH.SPREAD HALF OF THE AMENDED TOPSOIL MIXTURE AND
<br /> WORK INTO UPPER LAYER OF LOOSENED SUB-GRADE TO CREATE A TRANSITION LAYER.AFTER LIGHT ROLLING
<br /> GROUNDCOVER SPACING DIAGRAM AND NATURAL SETTLEMENT,PLACE REMAINING HALF OF THE PLANTING SOIL MIXTURE TO THE DEPTH REQUIRED
<br /> TO MEET THICKNESS,GRADES,AND ELEVATIONS SHOWN.
<br /> SCALE:NOT TO SCALE
<br /> 9. WITHIN TREE WELLS&PLANTER ISLANDS,REMOVE EXISTING SOIL AND OTHER DEBRIS,TO A MINIMUM DEPTH OF
<br /> 18"AND REPLACE WITH AMENDED TOPSOIL.ADD ADDITIONAL SOIL,AS REQUIRED PER DETAILS AND NOTES.
<br /> 10. THE CONTRACTOR SHALL SUBMIT SHIPPING TICKETS FOR IMPORTED TOP SOIL AND HUMUS MATERIAL TO THE
<br /> LANDSCAPE ARCHITECT 60 DAYS PRIOR TO INSTALLATION FOR REVIEW AND WRITTEN APPROVAL.
<br /> GENERAL PLANTING PLAN NOTES:
<br /> Date Description
<br /> o
<br /> INSTALL BARK MULCH IN T DIA. ° O REMOVE CONTAINER FROM PLANT AND 1. ALL LANDSCAPE AREAS THAT HAVE BEEN PREVIOUSLY TREATED WITH CEMENT,SHALL BE EXCAVATED A 1 08/09/2024 SIGNAGE COMMENTS
<br /> SAUCER.SAUCER SHALL BE SCORE ROOTBALLS TO LOOSEN ANY MINIMUM OF 6"BELOW BOTTOM OF TREATMENT AREA AND REMOVED FROM THE SITE.BACKFILL WITH TOPSOIL
<br /> SOAKED WITH WATER AFTERo ROOTBOUND MATERIAL PRIOR TO TO ORIGINAL GRADE PRIOR TO ADDING THE SPECIFIED AMENDED SOIL PER THE PLANS.
<br /> PLANTING. o INSTALLATION.
<br /> 2. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY WITH OWNER AND UTILITY COMPANIES THE LOCATIONS OF
<br /> ALL UTILITIES PRIOR TO CONSTRUCTION,TO DETERMINE IN THE FIELD THE ACTUAL LOCATIONS AND ELEVATIONS
<br /> FINISH GRADE BACKFILL WITH TOPSOIL.AMEND OF ALL EXISTING UTILITIES,WHETHER SHOWN ON THE PLANS OR NOT.THE CONTRACTOR SHALL CALL UTILITY
<br /> o O TOPSOIL PER LAB ANALYSIS AND NOTIFICATION CENTER 72 HOURS PRIOR TO CONSTRUCTION.
<br /> PROJECT SPECIFICATIONS.
<br /> 3. THE CONTRACTOR SHALL EXAMINE FINISH SURFACE,GRADES,TOPSOIL QUALITY AND DEPTH.DO NOT START ANY
<br /> =III III III III III III WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.VERIFY LIMITS OF WORK BEFORE
<br /> I1=1I)� =II =III=III=III= STARTING.
<br /> =III_ITI=iT
<br /> 4. THE CONTRACTOR IS TO REPORT ALL DAMAGES TO EXISTING CONDITIONS AND INCONSISTENCIES WITH PLANS
<br /> III-_ 6" 6' III- � TO THE LANDSCAPE ARCHITECT.
<br /> IIIII MIN. MIN.-IIIII
<br /> =I =I SCARIFV 4"DEEP 5. ALL PLANT MASSES TO BE CONTAINED WITHIN A 3"LAYER OF BARK MULCH BED,UNLESS NOTED OTHERWISE.ALL
<br /> III- III=III=III- _ - AND RECOMPACT TREES LOCATED IN LAWN AREAS SHALL HAVE A T DIAMETER CIRCLE,ON CENTER OF TREE,WITH 3"BARK MULCH
<br /> IIIII -11 LAYER.
<br /> 6. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE IN ALL LANDSCAPE BEDS.
<br /> 7. CONTRACTOR TO FINE GRADE AND REMOVE ALL ROCK GREATER THAN 1 INCH DIAMETER IN ALL PLANTING AREAS
<br /> PRIOR TO PLANTING,AND PROVIDE A SMOOTH AND CONTINUAL SURFACE,FREE OF IRREGULARITIES(BUMPS OR
<br /> DEPRESSIONS)&EXTRANEOUS MATERIAL OR DEBRIS.
<br /> SHRUB PLANTING 8. PLANT QUANTITIES LISTED IN THE LEGEND ARE INTENDED TO ASSIST THE CONTRACTOR IN EVALUATING THEIR
<br /> 2 OWN TAKE OFFS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR BID QUANTITIES AS INDICATED ON THE PLANS.
<br /> SCALE:NOT TO SCALE IF THERE IS A DISCREPANCY BETWEEN THE NUMBER IN THE PLANT LEGEND AND THE QUANTITY OF GRAPHIC
<br /> SYMBOLS SHOWN,THE GRAPHIC SYMBOL QUANTITY SHALL GOVERN. 0NMI-,
<br /> 9. CONTRACTOR SHALL NOT REMOVE ANY TREES DURING CONSTRUCTION WITHOUT THE EXPRESS WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.EXISTING VEGETATION TO REMAIN SHALL BE PROTECTED AS
<br /> DIRECTED BY THE LANDSCAPE ARCHITECT.
<br /> 10. LANDSCAPE MAINTENANCE PERIOD BEGINS IMMEDIATELY AFTER THE COMPLETION OF ALL PLANTING
<br /> OPERATIONS AND ACKNOWLEDGEMENT THAT ALL PUNCH LIST ITEMS HAVE BEEN COMPLETED BY THE
<br /> CONTRACTOR.MAINTAIN SHRUBS AND OTHER PLANTS UNTIL FINAL ACCEPTANCE OR 90 DAYS AFTER
<br /> NOTIFICATION AND ACCEPTANCE,WHICHEVER IS LONGER.WARRANTY ALL PLANTINGS FOR A PERIOD OF ONE(1)
<br /> YEAR FROM THE DATE OF ACCEPTANCE. STATE OF
<br /> WASHINGTON
<br /> LICENSED
<br /> BOULDER 11. REMOVE EXISTING WEEDS FROM PROJECT SITE PRIOR TO THE ADDITION OF ORGANIC AMENDMENTS AND LANDSCAPE ARCHITECT
<br /> FERTILIZER.
<br /> 12. BACKFILL MATERIAL FOR SHRUB PLANTING SHALL CONTAIN:ONE PART FINE GRADE COMPOST TO FOUR PARTS BECKY F.STRICKLER
<br /> TOPSOIL BY VOLUME.INCORPORATE ANY SLOW RELEASE FERTILIZERS AND AMENDMENTS PER SOIL LAB LICENSE No.1478
<br /> ANALYSIS RECOMMENDATIONS. EXPIRESON naoarzsze
<br /> FINISH GRADE 13. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ALL PLANT MATERIAL SUBSTITUTIONS FROM THE Seal 1 Signature
<br /> 213 HT LANDSCAPE ARCHITECT 90 DAYS PRIOR TO INSTALLATION.PLANT SUBSTITUTIONS WITHOUT PRIOR WRITTEN
<br /> \ APPROVAL THAT DO NOT COMPLY WITH THE DRAWINGS AND SPECIFICATIONS MAY BE REJECTED BY THE
<br /> LANDSCAPE ARCHITECT AT NO COST TO THE OWNER.THESE ITEMS,IF REJECTED,WILL BE REQUIRED TO BE
<br /> REPLACED WITH PLANT MATERIALS THAT ARE IN COMPLIANCE WITH THE DRAWINGS.
<br /> 'I - -=Ir
<br /> III III III 14. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL PLANT MATERIAL IN THE SIZE SPECIFIED ON PLAN
<br /> ai 1/3 HT.= - -� o ,III IL=(IJ-UNDISTURBED PRIOR TO INSTALLATION.IN THE EVENT THE PLANT MATERIAL IS NOT AVAILABLE IN THE SIZE SPECIFIED,THE
<br /> I I-I - 1- = SUBGRADE CONTRACTOR SHALL SUBMIT TO THE OWNERS'REPRESENTATIVE,AND THE LANDSCAPE ARCHITECT,A WRITTEN
<br /> ESTIMATE TO INCREASE PLANT MATERIAL(AND INSTALL)THE NEXTAVAILABLE CONTAINER SIZE PLANT(I.E.4"POT
<br /> =III=III=1I? TO ONE GALLON CONTAINER).
<br /> Is
<br /> '-11I-11I-11I-11I-III=11=,. - r-III-11I-11I-11I--i I=III=1 I=III=1 1= _ - -111=1 I=III=1 =11I-i
<br /> __ 15. PRIOR TO MOBILIZATION THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT,IN WRITING,IF THEY
<br /> rn 6"PEA GRAVEL - =III=III=III=III=III=III=III=III=III=III=III= -III= -III= - BELIEVE ANY OF THE PLANT MATERIAL IDENTIFIED ON THE PLAN MAY NOT BE SUITABLE FOR THE SITE OR MAY
<br /> g '1=III-1 1=III=III=III=III=III=1 =I I=III=III=III=III=III=III=III=III=lll
<br /> = III=III=III=III=III= -III-III=III=III=III=III=III=III= - DIE. SUBSTITUTION REQUESTS MAYBE GRANTED BY THE LANDSCAPE ARCHITECT PRIOR THE START OF
<br /> 1 Project Name
<br /> --��� ���=���= �� �� =1I�I i 1=��c���-� CONSTRUCTION ACTIVITIES.IF NOTIFICATION IS NOT GIVEN TO THE LANDSCAPE ARCHITECTT ALL PLANTING
<br /> -I11=III=III=1I i_ WHICH FAILS TO GROW(EXCEPT FOR DEFECTS RESULTING FROM LACK OF ADEQUATE MAINTENANCE AS
<br /> DETERMINED BY THE OWNER,NEGLECT OR VANDALISM)SHALL BE REPLACED BY THE CONTRACTOR AT THE SILVER LAKE
<br /> CONTRACTOR'S EXPENSE.
<br /> m 16. NOTIFY THE LANDSCAPE ARCHITECT IN WRITING,WHEN CONDITIONS DETRIMENTAL TO PLANT GROWTH ARE
<br /> ENCOUNTERED,SUCH AS RUBBLE FILL,POOR PLANTING SOIL,ADVERSE DRAINAGE CONDITIONS,OR Project Number
<br /> x OBSTRUCTIONS,PRIOR TO PLANTING.
<br /> 12 BOULDER PLACEMENT 032.3190.009
<br /> 3
<br /> 17. PLANTING RESTRICTIONS-PLANTING IS NOT PERMITTED DURING THE FOLLOWING CONDITIONS,UNLESS
<br /> SCALE:NOT TO SCALE OTHERWISE APPROVED IN WRITING: Description
<br /> A. COLD WEATHER:LESS THAN 32 DEGREES FAHRENHEIT
<br /> 6. HOT WEATHER:GREATER THAN 90 DEGREES FAHRENHEIT PLANTING DETAILS&NOTES
<br /> m C. WET WEATHER:SATURATED SOIL
<br /> D. WINDY WEATHER:WIND VELOCITIES GREATER THAN 20 M.P.H.
<br /> 22. ALL PLANTING AREAS SHALL BE HAND WATERED DURING PERIODS OF DRY WEATHER FOR A DURATION OF 5
<br /> YEARS..
<br /> 23. ALL PLANTS MUST COMPLY WITH THE AMERICAN STANDARD FOR NURSERY STOCK.THOSE THAT DO NOT,WILL scale
<br /> BE REJECTED.
<br /> un
<br /> Y L00.20 0
<br /> City of Everett Permit Services
<br /> EVERETT Reviewed for Permit 01/27/2025
<br /> 02024 Gensler
<br />
|