My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8204 BEVERLY LN 2005 2025-11-10
>
Address Records
>
BEVERLY LN
>
8204
>
8204 BEVERLY LN 2005 2025-11-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 1:09:33 PM
Creation date
11/10/2025 1:08:43 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
8204
Year
2005
Notes
DICK GRANT 8204 BEVERLY LN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />• <br />Receipt # <br />✓ Cost of Work Order 4,818.00 <br />Cost of Service Order <br />Contact Person Dick Grant C D <br />Requested By Gordon Witcher 2Q06 <br />Property Owner (name) Dick Grant APR <br />Charge Cost to (name if different than owner) <br />Address 8204 Beverly Lane <br />�iging�fi's — <br />rett <br />Date Paid <br />Work Order# <br />Service Order # <br />Telephone # <br />Date of Request <br />Zip 98203 <br />Installation Location 8204 Beverly Lane <br />Installation type/description/size/etc. New hydrant. Expose 8" main, cut in tee. Trench to edge <br />of ROW, install pipe and hydrant. Restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />2,020.00 <br />2,187.00 <br />528.00 <br />83.00 <br />$4,818.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welborn <br />Paul McKee <br />Gerry Crum <br />Dennis Roberson <br />., Prepared by: Gerry Crum to Estimate Prepared 4-26-06 <br />Accepted by: <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />S:\#Common\clerical\Cost.est\Dick Grant.DOC I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.