Laserfiche WebLink
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 11 <br /> DATE: 7/11/2024\4 CALCULATIONS\HYDRAULIC CALC'S\ACHILLES EX MEZZ CALC.SDF <br /> JOB TITLE: Achilles <br /> Pipe Tag K-fac Add F1 Add F1 To Fit: L C (Pt) <br /> Frm Node E1 (ft) PT (q) Node/ Nom ID Eq.Ln. F (Pe) <br /> To Node E1 (ft) PT Tot. (Q) Disch Act ID (ft.) T Pf/ft. (Pf) <br /> Pipe: 65 0.0 0.0 7.00 120 0.8 <br /> S31 9.0 24.1 45.0 1.500 ---- 0.00 0.4 <br /> 29 9.9 23.3 45.0 1.682 7.00 0.058 0.4 <br /> Pipe: 66 11.20 55.0 Disch 1.75 120 2.6 <br /> G1 9.9 26.7 45.0 29 1.500 T: 9.9 9.90 -0.4 <br /> S31 9.0 24.1 100.0 1.682 11.65 0.256 3.0 <br /> Pipe: 67 0.0 0.0 7.00 120 1.0 <br /> S33 9.0 33.8 53.5 1.500 ---- 0.00 0.4 <br /> 30 9.9 32.9 53.5 1.682 7.00 0.081 0.6 <br /> Pipe: 68 11.20 65.2 Disch 1.75 120 3.7 <br /> H1 9.9 37.6 53.5 30 1.500 T: 9.9 9.90 -0.4 <br /> S33 9.0 33.8 118.7 1.682 11.65 0.352 4.1 <br /> Pipe: 68A 0.0 0.0 0.67 120 0.9 <br /> A 9.3 36.3 45.7 5 1.500 1: 9.9 9.90 0.3 <br /> Al 9.9 35.4 45.7 1.682 10.57 0.060 0.6 <br /> Pipe: 68B 0.0 75.3 7 0.67 120 10.4 <br /> B 9.3 36.3 128.5 4 1.500 T: 9.9 9.90 0.3 <br /> B1 9.9 25.9 203.8 1.682 10.57 0.957 10.1 <br /> Pipe: 68C 0.0 75.9 13 0.67 120 10.5 <br /> D 9.3 36.5 128.8 11 1.500 T: 9.9 9.90 0.3 <br /> D1 9.9 26.0 204.7 1.682 10.57 0.965 10.2 <br /> Pipe: 68D 0.0 90.5 19 0.67 120 11.7 <br /> E 9.3 37.1 126.9 17 1.500 T: 9.9 9.90 0.3 <br /> E1 9.9 25.4 217.4 1.682 10.57 1.078 11.4 <br /> Pipe: 68E 0.0 97.9 S25 0.67 120 12.5 <br /> F 9.3 38.1 127.8 23 1.500 T: 9.9 9.90 0.3 <br /> F1 9.9 25.6 225.7 1.682 10.57 1.156 12.2 <br /> Pipe: 68F 0.0 100.0 S31 0.67 120 12.9 <br /> G 9.3 39.6 130.0 28 1.500 T: 9.9 9.90 0.3 <br /> G1 9.9 26.7 230.0 1.682 10.57 1.197 12.6 <br /> Pipe: 68G 0.0 0.0 0.67 120 4.0 <br /> H 9.3 41.6 118.7 S33 1.500 T: 9.9 9.90 0.3 <br /> H1 9.9 37.6 118.7 1.682 10.57 0.352 3.7 <br /> Pipe: 69 0.0 0.0 6.00 120 0.0 <br /> B 9.3 36.3 45.7 Al 4.000 ---- 0.00 -0.0 <br /> A 9.3 36.3 45.7 4.260 6.00 0.001 0.0 <br />