My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-12-02
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 8:24:33 AM
Creation date
11/18/2025 11:55:57 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Year
2025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dimensions and Weight Chart - ASTM A 53 Type E <br /> STANDARD (SCHEDULE 40) BLACK PLAIN END <br /> Nominal Size O.D. Inches Nominal Wall Weight/Lb. Ft. <br /> 2" 2.375 .154 3.66 <br /> 2-1/2" 2.875 .203 5.80 <br /> 3" 3.500 .216 7.58 <br /> 4" 4.500 .237 10.88 <br /> 5" 5.563 .258 14.63 <br /> 6" 6.625 .280 18.99 <br /> 8" 8.625 .322 28.58 <br /> 10" 10.750 .365 40.52 <br /> 12" 12.750 .375 49.61 <br /> A53 Electric-Resistance Welded Tensile Requirements <br /> Type E, Grade B <br /> • Black and hot-dipped galvanized Tensile Strength, min. 60, 000 psi <br /> • Nominal Sizes: Schedule 40 2" - 12" Yield Strength, min. 35,000 psi <br /> • UL Listed; FM Approved <br /> • Suitable for welding, threading and grooving Bending Test (Cold) <br /> • Produced to ASTM A 53/53M, Federal Specification <br /> WW-P404 and ASME B36.1 OM, For NPS 2 and under <br /> Degree of Bend 900 <br /> Hydrostatic Testing and Diameter of Mandrel 12 x outside pipe diameter <br /> Nondestructive Electric Testing <br /> Flattening Test <br /> Hydrostatic inspection test pressures for plain-end <br /> pipe are listed in Table X 2.2 of the A53/A 53M As a test for ductility of the weld for pipe 2-1/2" NPS <br /> specification. Test pressures shall be maintained for a and larger, position the weld at 0°and alternately at <br /> minimum of five seconds. 900 to the direction of force and flatten until the OD is <br /> 2/3 of the original outside diameter. No cracks shall <br /> Nondestructive electric testing of the weld seam is occur along the inside or outside surface of the weld. <br /> required on each length of ERW pipe NPS 2 and <br /> larger. All of our facilities have quality systems in <br /> place. At a minimum, they're registered to <br /> ISO 9001:2008 Quality Management Systems, <br />
The URL can be used to link to this page
Your browser does not support the video tag.