Laserfiche WebLink
14 <br />IPUBLIC WORKS <br />PERMIT y1, <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street -41 <br />Everett, WA 98201 <br />(425)257-8810 <br />P 7'� T �Pl 'C!R3�'tS'cireRfAeri'!h <br />OWNER NAME APPLICANT NAME <br />AND ADDRESS.901 MAPLE ST AND ADDRESS: <br />EXrMTT NA 98201 <br />PHONE: PHONE: <br />TAX PARCEL I.D. # PR <br />SOOR PLAT IMPROVE€ MS 1202— 24-05C <br />° <br />DESCRIPTION OF <br />PROPOSED WORK <br />Date <br />P190509-040 <br />Public Works Permit # <br />Building Permit # <br />Planning Reference # <br />�50a00 •� <br />Public Works Fee $jrl <br />Guarantee $ <br />PERMIT CONDITIONS <br />1':All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />--=3 : Call Location,Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4 PER APPROVED PLAN DATED 9-21-05 <br />d� <br />/ <br />—a r <br />Fri <br />r1i <br />1-'-9 M <br />Z <br />f <br />N� <br />211 <br />O <br />\ -.''N4 , 4 - % } !,• ' (l..y <br />�j uM1 f�} � •ri �� '.C` !+_.Y'i <br />� e A <br />F`...L <br />` <br />ACKNOWLEDGEMENT OF CONDITIONS <br />� The undersigned owner/applicant hereby agrees to hold and <br />e .�' ✓rri� - �' save harmless the City of Everett from any and all claims for <br />Approved to`r"Construction D damages, costs, expenses, causes of action that may arise <br />., 0 because of installation anmAtenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon not,''Ide fromm the Ci y and to replace public <br />FINAL INSPECTION ,t property damaged thefeb/ <br />Approved as Constructed Date , ri" 7 <br />p <br />Sign-0 pca Date <br />f i( <br />T,// !6 <br />WORK AUTHORIZED BY THIS PERMIT MUST/BE STARTED WITHIN 180 DAYS OF DATE PERMIT ISJSSUED AND THAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />