Laserfiche WebLink
Work Activity Work Order <br />Page 3 <br />3/13/2007 10:02 <br />Issued By WMW WARD, MICHAEL W. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 7/11/2006 <br />Fund 401 Account 5 Program 710 Function 119 Activity 675 <br />Program <br />Title CONVERT 3211 WAVE DR 710119675 <br />Work Order No 20061183 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Date 7/11/2006 Time 12:41 Oriqinal WO Billino <br />Vehicle Costs <br />Type Vehicle No Description Hours Cost Billing Date Billing Code <br />V J0026 1997 FORD 1 TON SVC TRUCK 3 20.7 07/14/2006 <br />V J0046 1999 STERLING 5 YARD DUMP 3 47.7 07/14/2006 <br />Total Vehicle Cost $68.40 <br />Material Costs <br />Type <br />Mater No <br />Description Quantity <br />Cost <br />Billing Date Billing C, <br />M <br />ADAP34000347 <br />ADAPTER 3/4 CST X 3/4 IPS INSTA-TITE 1 <br />9.595 <br />07/14/2006 <br />M <br />ADAP34000547 <br />ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 <br />9.395 <br />07/14/2006 <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC W/DI LID AND READER (SMAL1 <br />52.695 <br />07/14/2006 <br />M <br />ELL034104247 <br />ELBOW 3/4 NPT 90 DEG STREET CAST BRASS (1/4 BEND) 1 <br />1.83 <br />07/14/2006 <br />M <br />METE34141847 <br />METER 5/8 X 3/4 NEPTUNE W/PRO READ IN CU FT RADIO 1 <br />179.302 <br />07/14/2006 <br />M <br />PIPE34060647 <br />PIPE 3/4 POLY IPS 10 <br />2.64 <br />07/14/2006 <br />M <br />SETT34033647 <br />SETTER COPPER 5/8 X 3/4 (HEIGHT 12) LEG LENGTH 15 1 <br />62.93 <br />07/14/2006 <br />Total Material Cost <br />$318.40 <br />NA Costs <br />Type <br />Na No <br />Description Quantity Cost Billing Date <br />Billing Code <br />NA <br />N/A <br />METER NUMBER 80818373 1 0 07/14/2006 <br />Total NA Cost <br />$0.00 <br />Personnel Costs <br />Type <br />ID <br />Name <br />Hours <br />Cost Billing Date Earning Code Class <br />P <br />DKR <br />DAY, KEVIN R. <br />3 <br />58.257 07/14/2006 <br />P <br />JGD <br />JACOBS, GREG D. <br />3 <br />50.4 07/14/2006 <br />P <br />WDL <br />WEAVER, DEAN L. <br />2 <br />50.066 07/14/2006 <br />Total Personnel Cost <br />$158.73 <br />Total Cost <br />$545.53 <br />OB <br />