My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/11/19 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/11/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 9:40:59 AM
Creation date
11/20/2025 9:36:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project title: An Ordinance creating a Special Improvement Project entitled “Evergreen Way Drainage <br />Improvements” Fund 336, Program 051. <br />Council Bill # interoffice use <br />CB 2511-63 <br />Project: Evergreen Way Drainage Improvements <br />Partner/Supplier: N/A <br /> Location: 75th Street to Madison Street <br />Preceding action: None <br />Fund: 336 - Water & Sewer System Improvements Fund <br />Agenda dates requested: <br />Briefing <br />Proposed action 11/12/25 <br />Proposed action 11/19/25 <br />Consent <br />Action 12/03/25 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Tom Hood <br />Phone number: <br />425-257-8809 <br />Email: <br />THood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br />Administration <br />Council President <br />Fiscal summary statement: <br />The funding source for this project will be Fund 401 Water and Sewer Utility Fund. <br />The programmed available funding for design and construction of this project is $7,500,000. <br />Project summary statement: <br />The project will address flooding on Evergreen Way between approximately 75th Street and <br />Madison Street. As part of the work, problematic existing catch basins in the drive lane will be <br />removed/abandoned and the new collection system will be in the gutter line outside of the <br />wheel track. Sidewalk, curb and roadway pavement will be restored to match existing <br />configuration. <br />This work is required to be completed before a future anticipated pavement maintenance <br />overlay project. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Evergreen Way Drainage <br />Improvements” Fund 336, Program 051. <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.