Laserfiche WebLink
City of Everett 00 52 13 - 4 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 52 13 - 4 AGREEMENT FORM <br />Contract. The Contractor will defend and indemnify and hold harmless the City whether <br />a Claim is asserted directly against the City, or whether a Claim is asserted indirectly <br />against the City, e.g., a Claim is asserted against someone else who then seeks <br />contribution or indemnity from the City. The amount of insurance obtained by, <br />obtainable by, or required of the Contractor does not in any way limit the Contractor’s <br />duty to defend and indemnify the City. The City retains the right to approve Claims <br />investigation and counsel assigned to said Claim and all investigation and legal work <br />regarding said Claim shall be performed under a fiduciary relationship to the City. This <br />Section 8 is in addition to any other defense or indemnity or hold harmless obligation in <br />the Contract Documents. <br />B. The Contractor’s obligations under this Section 8 shall not apply to Claims caused <br />by the sole negligence of the City. If (1) RCW 4.24.115 applies to a particular Claim, <br />and (2) such Claim is caused by or results from the concurrent negligence of (a) the <br />Contractor and (b) the City, then the Contractor’s liability under this Section 8 shall be <br />only to the extent of the Contractor’s negligence. <br />C. As used in this section: (1) “City” includes the City’s officers, employees, agents, and <br />representatives; (2) “Claims” include all losses, claims, demands, expenses (including, <br />but not limited to, attorney’s fees and litigation expenses), suits, judgments, or damage, <br />whether threatened, asserted or filed against the City, whether such Claims sound in <br />tort, contract, or any other legal theory, whether such Claims have been reduced to <br />judgment or arbitration award, irrespective of the type of relief sought or demanded <br />(such as money or injunctive relief), and irrespective of the type of damage alleged <br />(such as bodily injury, damage to property, economic loss, general damages, special <br />damages, or punitive damages); and (3) “Contractor” includes Contractor, its <br />employees, agents, representatives and subcontractors. If, and to the extent, <br />Contractor employs or engages subcontractors, then Contractor shall ensure that each <br />such subcontractor (and subsequent tiers of subcontractors) shall expressly agree to <br />defend and indemnify and hold harmless the City to the extent and on the same terms <br />and conditions as the Contractor pursuant to this section. <br />10. Insurance. The Contractor shall purchase and maintain such insurance as set <br />forth in the Contract Documents Failure to maintain such insurance shall be a material <br />breach of the Contract. The City shall be entitled to damages for such a breach that <br />include, but are not limited to, any loss (including, but not limited to, third party litigation <br />expenses and professional fees) suffered by the City if the City is determined to be <br />solely or concurrently negligent, and if the City suffers any loss or must pay or defend <br />against any such claim, suit, demand or damage as a result of such breach. <br />11. Waiver of Industrial Insurance Immunity. Contractor waives any right of <br />contribution against the City. It is agreed and mutually negotiated that in any and all <br />claims against the City, its agents or employees, the Contractor, a subcontractor, <br />anyone directly or indirectly employed by the Contractor or subcontractor, or anyone for <br />whose acts any of them may be liable, the defense and indemnification obligations <br />hereunder shall not be limited in any way by any limitation on the amount of damages, <br />compensation, or benefits payable by or for the Contractor or any subcontractor under