Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br />An Ordinance closing a Special Improvement Project entitled “Water Filtration Plant <br />Emergency Generator Replacement” Fund 336, Program 006, as established by Ordinance No. <br />3730-20. <br />Council Bill # interoffice use <br />CB 2511-72 <br />Project: Water Filtration Plant Emergency Generator Replacement <br />Partner/Supplier: <br /> Location: Water Filtration Plant <br />Preceding action: Ordinance 3730-20, approved on 2/12/2020 Fund: 336 – Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />1st Reading 11/19/25 <br />Proposed action 12/03/25 <br />Consent <br />Action 12/10/25 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Ryan Sass <br /> <br />Phone number: <br />(425) 257-8942 <br /> <br />Email: <br />RSass@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Ordinance No. 3730-20 appropriated $10,400,000 in local funds to Fund 336, Program 006 for <br />the project. <br /> <br />The design and construction phase of this project was completed at a cost of $10,019,365. <br /> <br />Project summary statement: <br />The Water Filtration Plant (WFP) Emergency Generator system was previously comprised of two <br />generators which have experienced failures and reached the end of their useful life. The 30+ year <br />old generators were mismatched in size, located at opposite sides of the water plant and their <br />combined output was not large enough to meet the demands of the plant. <br />The project completed design and construction of two new generators to be housed together in a <br />common location with a dedicated fuel storage facility. Work also included replacement of <br />electrical controls and upgrades to the electrical infrastructure to ensure continuous operation of <br />the plant in the event of a loss of external power. <br />The project has been completed, all necessary replacements and upgrades have been installed. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance closing a Special Improvement Project entitled “Water Filtration Plant <br />Emergency Generator Replacement” Fund 336, Program 006, as established by Ordinance No. <br />3730-20. <br /> <br />City Council Agenda Item Cover Sheet