My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/11/19 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/11/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 9:40:59 AM
Creation date
11/20/2025 9:36:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An ORDINANCE Creating a Special Improvement Project Entitled “Wiggums Hollow Playground <br />Repair”, Fund 354, Program 108, to Accumulate Project Costs in the Amount of $500,000 <br />Council Bill # interoffice use <br />CB 2511-74 <br />Project: Wiggums Hollow Playground Repair <br />Partner/Supplier: LSI/ Play Creation <br /> Location: 2808 10TH St Everett <br />Preceding action: None <br />Fund: Fund 354, Program 108 (CIP-3) <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />1st Reading 11/19/25 <br />Proposed action 12/03/25 <br />Consent <br />Action 12/10/25 <br />Ordinance X <br />Public hearing <br /> <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Ordinance <br />Letter of Commitment <br /> <br />Department(s) involved: <br />Parks & Facilities <br />Administration <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425.257.8335 <br /> <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The proposed Ordinance will fund the full replacement of the existing fire damaged play <br />equipment and surfacing material at a cost of $500,000. Equipment procurement and <br />installation will be through King County Directors Association (KCDA) Cooperative. <br /> <br />Project summary statement: <br />On Monday, October 27th Wiggums Hollow Park experienced a fire that damaged <br />multiple areas of the playground and structures within. The central play structure was <br />deemed a total loss. The tot lot, omni spinner and music area suffered minor damage as <br />well and will need replacement. <br /> <br />This playground repair project includes demolition of the existing playground main <br />structure, and any damaged playground equipment and installation services including <br />the rubber playground surfacing system. The work is planned to begin in the winter of <br />2026 with completion coming before the summer of 2026. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Wiggums Hollow <br />Playground Repair”, Fund 354, Program 108, to accumulate project costs in the Amount <br />of $500,000. <br /> <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.