Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/15/2025 4/15/2025 ELEC 10-FINAL** PAUL WEILAND CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 4/11/2025 7:54 AM Mary Dinsmore-Smith <br /> You must call the contact before arrival in order to make sure he will be there <br /> Contact Name:Michael Trujillo <br /> Site Address:223 94TH ST SE <br /> Phone:4257509547 <br /> e-Mail:permit@infinitysolarusa.com <br /> A grounding electrode system must be added to the garage per 250.32(A). Pipes entry into the house from the exterior must be sealed with an <br /> approved sealing compound 300.7(A) <br /> 5/5/2025 5/5/2025 BLDG 16-FINAL Matt Schreifels APPRVD-PERMIT see notes <br /> FINAL <br /> Notes: <br /> 5/1/2025 12:47 PM Mary Dinsmore-Smith <br /> Contact Name:Michael Trujillo <br /> Site Address:223 94TH ST SE <br /> Phone:4257509547 <br /> e-Mail:permit@infinitysolarusa.com <br /> Inspected from ground level.Installation matched approved plans. <br /> 5/5/2025 5/5/2025 ELEC 10-FINAL** PAUL WEILAND APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 5/1/2025 12:46 PM Mary Dinsmore-Smith <br /> Contact Name:Michael Trujillo <br /> Site Address:223 94TH ST SE <br /> Phone:4257509547 <br /> e-Mail:permit@infinitysolarusa.com <br /> 5/6/2025 5/13/2025 CERTIFICATE OF CINDY BERGSMA NOT REQUIRED <br /> OCCUPANCY <br /> Notes: <br /> I <br /> Printed:Thursday,20 November,2025 2 of 2 rk <br /> SUPERION <br />