Laserfiche WebLink
PHOTOVOLTAIC ROOF MOUNT SYSTEM <br /> 19 MODULES-ROOF MOUNTED - 7.790 kW DC, 6.400 kW AC, 223 94TH ST SE, EVERETT, WA 98208 inflnitysolar <br /> INFINITY HOME SOLUTIONS <br /> 6406 E MILL PLAIN <br /> PHOTOVOLTAIC SYSTEM SPECIFICATIONS: SITE DETAIL' SHEET INDEX: DS06: JUNCTION BOX ULCERTIFICATION VANCOUVER1NA9681 <br /> UTILITY: SNOHOMISH CO, PUD PV0.0: GENERAL NOTES AND PROJECT DATA DS 07: WRING SPECIFICATION PH0NE:1-800-818-0598 <br /> SYSTEM SIZE; 7.790 KW DC INFINITYSOLAR.COM <br /> 6.400 KW AC MSP: EXISTING 200A MSP WITH 2O0A MAN BREAKER PV 1.0: PLOT PLAN DS 08: MOUNTING-DATA SHEET <br /> MODULE TYPE&AMOUNT: (19)ZNSHINESOLARZXM7-SH108.410M ROOFMATERIAL: COMPOSITE SHINGLE PV1.1: SITE PLAN DS 09: RACKING-DATA SHEET REVISIONS <br /> MODULE DIMENSIONS: (LNV/H)67.87"/44.601.8" ASCE 7-10 WINDSPEEDS: (3 SEC GUST IN MPH) PV 1.2 ROOF SECTION DS 10: RACKING-GROUNDING <br /> RISK CATEGORY II: 110 MPH IM 1.0: INVERTER MAP DS 11: RACKING-CERTIFICATION heal Design <br /> Date Rev <br /> INVERTER: (10)AP SYSTEMS DS3-S S 1,1: MOUNT DETAILS Initial Design 824124 00 <br /> INTERCONNECTION METHOD: LOAD BREAKER <br /> AHJ: CITY OF EVERETT E 1,1: 3-LINE DIAGRAM <br /> E 1.2 3-LINE CALCULATION <br /> RACKING: GRASOL RACKING SYSTEM FOR COMP ROOF E 13 NOTES <br /> ARRAY AREA: 21.04 SQFT x 19=399.8 SQFT E 14 WARNING LABELS Signature with Seal <br /> DS 01: PVMODULE SPECIFICATION SHEET <br /> DS 02: MICROINVERTER SPECIFICATION SHEET <br /> DS 03: COMBINER PANEL CERTIFICATION <br /> DS 04: AC DISCONNECT UL CERTIFICATION <br /> DS 05: AC DISCONNECT UL CERTIFICATION • <br /> PHOTOVOLTAIC NOTES: <br /> 1.AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL WITH THE"SMACNA"-GUIDLINES FOR SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING .� <br /> DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK SYSTEMS. <br /> UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL 22.ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL FORCE F INCLUDING Project Name& <br /> PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361) CONSIDERATION OF aAP AND rAP BE DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE Address <br /> 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC <br /> THREAD-LESS COMPRESSION TYPE. LATERAL FORCE DETERMINATION. <br /> 3,MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 23,A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDEMANUAL SHALL BE ON THE JOB i LU <br /> U <br /> 4.NAMEPLATES SHALL BE PROVIDED FORALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER SITE PRIOR TO STARTING THE INSTALLING OF HANGERS AND/OR BRACES, I Z <br /> DISTRIBUTION SWITCH BOARDS,PANEL BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS, 24,WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING L1J <br /> ETC. ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO NON-PRESTRESSED REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR U_ 00 <br /> WITHSTAND THE WEATHER. DAMAGING THE REINFORCED BARS,WHEN INSTALLING THEM INTO EXISTING PRE-STRESSED CONCRETE U) N <br /> 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION,EXERCISE EXTREME CARE - � W rn Q Q <br /> APPROPRIATE WATER RUN OFF. AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A O H Q Z Z <br /> 6,CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR. • J = <br /> BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS, 25.THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW I Z J <br /> 7,SEE PROVIDED CUT SHEETS FORADDITIONAL EQUIPMENT SPECIFICATIONS ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26. t r O < <br /> 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD 26.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.601,310.8 D) 2 SATELLITE VIEW °� N of w <br /> APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 27.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE CV � <br /> J <br /> 9.JUNCTION,PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE DC SIDE OF THE SYSTEM.(NEC 250.97) �OO <br /> SCALE:NTS W W <br /> WIRING CONTAINED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF 28.THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF = <br /> MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM,(NEC 690.34) SMALLER THAN#6 COPPER WIRE.(NEC 250.64 B) U <br /> 10.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE 29.GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AT ; � � i <br /> FOLLOWING WARNING AT EACH JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE BUSBARS WITHIN LISTED EQUIPMENT,(NEC 250.64 C) <br /> UNGROUNDED CIRCUITS MAYBE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD, 30.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E) <br /> THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT 31.WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, <br /> MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND(NECE 690.35(F)) A SIGN WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED Ir <br /> 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED CONDUCTOR OF THE MOLT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER t �� ., Sheel GENERAL NOTES <br /> ame <br /> FROM ANY PHYSICAL DAMAGE. NEC210.5. N�,r---- <br /> 12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 32,CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250,97&250.92(B)&LAMC 93,250.97. AND PROJECT <br /> 13,OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA3R RATED, 33,DC CONDUCTORS EITHER DO NOT ENTERTHE BUILDING ORARE RUN IN METALLIC RACEWAYS OR °"" �"•"` - DATA <br /> 14,ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31 (E),LAMC 93,690.31(E) <br /> 15.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION, 34,ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT, Sheet Size <br /> r...�..,. ...�.. 4 <br /> COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED JUNCTION&PULL BOXES,RACEWAY,ETC)SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S ANSI B <br /> 16,DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BEAT THE OPTION OF THE INSTALLATION INSTRUCTIONS LAMC 93.690.110.3&93.110.3(B). P KWA922201 <br /> " t' <br /> CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES, 35.SCREWS,NUTS,BOLTS&WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE sk*. 11 X 17" <br /> 17.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY STAINLESS STEEL LAMC 93.110.3(B). <br /> ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS 36.NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE O Sheet Number <br /> APPROPRIATE. LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. t <br /> 18.WHENEVER DISCREPANCY IN QUANTITY OF EQUIPMENT,ARISES ON THE DRAWINGS OR 37,ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS " "" "• " e ��/ O O <br /> SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY ,sc V <br /> MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN REMOVABLE FASTENERS. <br /> THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM 311 REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE <br /> REQUIRED BY THE ARCHITECT/ENGINEER, BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC _ <br /> 19.ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR, <br /> OVER TO THE OWNER'S REPRESENTATIVE AT THE COMPLETION OR WORK. 39,THE ROOF MOUNTED PHOTOVOLTAIC MODULES,PANELS,OR SOLAR VOLTAIC ROLL ROOFING a v <br /> 20.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT, MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING <br /> 21.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE ROOF-COVERING MATERIAL. <br /> 1 GENERAL NOTES AND PROJECT DATA 40.ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 1/2"OFF THE ROOF SURFACE. VICINITY MAP <br /> Pvo.o SCALE:NTS <br />