Laserfiche WebLink
System Diagram <br /> - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - - - <br /> - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - - - <br /> - - - - - - - - - - - - - - - - - -m- - - - - - - - - - - - - - - - - - - <br /> I UFO C Stopper Sleeve • Grounding Lug Bonded Splice Ground Wire <br /> 4 Approved Enphase microinverters can provide equipment grounding of IronRidge systems, eliminating the need for <br /> grounding lugs and field installed equipment ground conductors (EGC).A minimum of two microinverters mounted to the <br /> same rail and connected to the same Engage cable is required. Refer to installation manuals for additional details. <br /> UL Certification r Cross-System Compatibility <br /> The IronRidge Flush Mount, - - • <br /> Tilt Mount, and Ground Mount XR Rails d XR1000 Only <br /> Systems have been listed to UL <br /> 2703 by Intertek Group plc. UFO/Stopper d <br /> �_UL 2703 is the standard for L Bonded Splice L N/A <br /> evaluating solar mounting Grounding Lugs 1 per Row 1 per Row 1 per Array <br /> systems. It ensures these devices Microinverters Enphase - M250-72, M250-60, M215-60, C250-72 <br /> will maintain strong electrical and & Power Darfon - MIG240, MIG300, G320, G640 <br /> mechanical connections over Optimizers SolarEdge - P300, P320, P400, P405, P600, P700, P730 <br /> an extended period of time in <br /> extreme outdoor environments. Fire Rating Class A Class A N/A <br /> Modules Tested or Evaluated with over 400 Framed Modules <br /> QGo to IronRidge.com/UFO Refer to installation manuals for a detailed list. <br /> 00 <br />