Laserfiche WebLink
Adaptive, Rafter-Friendly Installation <br /> • • <br /> Hit <br /> • i �' <br /> - . . . to . . <br /> When you find a rafter,you can move on. Place another screw to the left or right. If If more than 3 screws miss the rafter, <br /> Only 2 RD Structural Screws are needed. rafter is found,install 3rd and final screw. secure six screws to deck mount it. <br /> Trusted Strength & Less Hassle <br /> Structural capacities of HUG'M were reviewed in <br /> many load directions, with racking rail running <br /> cross-slope or up-slope in relation to roof pitch. <br /> For further details, see the HUG certification <br /> letters for attaching to rafters and decking. <br /> - IronRidge designed the HUG, in combination <br /> with the RD Strucutral Screw to streamline <br /> installs, which means the following: <br /> • No prying shingles <br /> • No roof nail interference <br /> 25-Year Warranty <br /> Product guaranteed free No pilot holes necessary <br /> of impairing defects. • No sealant (in most cases) <br /> • No buytl shims needed <br /> Attachment Structural Water Seal UL 2703 <br /> Loading Design Ratings <br /> The rafter-mounted Parts are designed HUG passed both Systems conform to <br /> HUG has been and certified for the UL 441 Section UL 2703 mechanical <br /> tested and rated to compliance with 27 "Rain Test" and and bonding <br /> support 1004 (Ibs) of the International TAS 100(A)-95 requirements. See <br /> uplift and 368 (Ibs) Building Code & "Wind Driven Rain Flush Mount Manual <br /> of lateral load. ASCE/SEI-7. Test" by Intertek. for more info. <br /> c <br /> 00 <br /> !' <br />