My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2307 COLUMBIA AVE 2025-12-01
>
Address Records
>
COLUMBIA AVE
>
2307
>
2307 COLUMBIA AVE 2025-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 10:47:46 AM
Creation date
11/20/2025 10:47:46 AM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2307
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Conditions: <br /> Wind Exposure "B" <br /> WindSpeed 110 mph Module Type: (36)- Silfab Elite SIL-420 BG Pitch: 220 _ <br /> Roof Type: Composition <br /> Snowload- 25 PSF Portrait orientation Landscape orientation A&RSOLAR <br /> Roof Pitch: 220 Halo Ultragrip Deck mounting spans - Halo Ultra grip Deck mounting sans - <br /> 9 p 9 p 9700 Martin Luther King Jr Way S, <br /> Zone Max span Zone Max span Seattle,WA 98118(206)707-9937 <br /> Z-1 49" Z-1 N/A <br /> Z-2 45" Z-2 N/A ° ° <br /> Z-3 27" Z-3 N/A <br /> Cantilever- 12" (24" if rafter mounting) Cantilever- 12" (24" if rafter mounting) <br /> Rafter mounting span- 72" zones 1-3 both Portrait and Landscape <br /> Eifattaching to both rafters and deck, the deck mounting span needs to apply to both sides of the deck mount. THIS DRAWING CONSTITUTES THE <br /> CONFIDENTIAL INFORMATION OF A&R SOLAR <br /> **Deck Mounting spans dependent on site conditions, roof slope and module size.** AND ITS RECEPTOR.POSSESSION DOES NOT <br /> CONFER ANY RIGHT IN OR LICENSE TO USE IT <br /> OR THE INFORMATION DISCLOSED HEREIN <br /> Mounting across shingle step is if shingle step over 1/8" NOR ANY RIGHT TO REPRODUCE THIS <br /> DRAWING OR ANY PART HEREIN WITHOUT <br /> okay if 1/8" thickness or less install on the flat areas THE WRITTEN CONSENT OF A&R SOLAR. <br /> Roof Zones <br /> Q <br /> Gable Roof Hipped Roof ^� .w oo > o <br /> `° � La00 <br /> a a s a a C: � - <br /> a Ln <br /> 3 2 3 3 2 3 a s 3 2 3 u0 E U -- <br /> p o > <br /> 0 d N N W <br /> 2 <br /> in <br /> ;4Z-3 - 2 1 2 2 1 2 2 1 2 2 1 2 <br /> HUG mount Sample 2 REVISIONS <br /> 2 Rev. #: Date: <br /> Attachment Plan 1 <br /> For demonstration purpoSeS Z-2 Z-Z <br /> 3 2 3 3 2 3 ta a� 3 2 3 <br /> Z-3 Z-3 <br /> Designed by: Tyler M. <br /> a=3 feet Project Manager: <br /> Arthur Eith <br /> (612) 298-1795 <br /> Current Date:Dec 06, 2024 <br /> A3 Racking - <br /> Halo <br />
The URL can be used to link to this page
Your browser does not support the video tag.