Laserfiche WebLink
CONTRACTOR <br /> DAN L EY PROJECT <br /> AHJ UTILITY SCOPE OF WORK VICINITY MAP <br /> SWITCH ELECTRIC HOME <br /> CITY OF EVERETT SNOHOMISH COUNTY PUD NO 1 (N) 2.580KW DC/ 11.520KW AC ROOF MOUNTED PV SYSTEM ENERGY <br /> (06) SILFAB SOLAR SIL-430 QD MODULES 16778 146TH ST SE SUITE <br /> (01) GM ENERGY E1.11 INVERTER P <br /> 154, MONROE, WA, USA, <br /> (06) SOLAR RAPID SHUTDOWN DEVICE _ +1 425 244 5511 <br /> CODES AND STANDARDS WITH AMENDMENTS (01) 200A RATED COMBINER PANEL LIC TYPE: ELECTRICAL <br /> 2021 IBC (01) HOMEGRID STACK-D BATTERY CABINET UNIT WITH LIC NO.: SWITCEL91OPK <br /> 2021 IFC (02) 4.8 KWH MODULES, 9.6KWH TOTAL Q <br /> 2021 IRC PROJECT INFO&ADDRESS <br /> 5130 Narbeck Ave, <br /> 2023 NEC Everett,WA98203,USA DANLEY PROJECT <br /> 5130 NARBECK AVE, <br /> EVERETT, <br /> ENVIRONMENTAL Q -4 WA 98203 <br /> WIND SPEED: 110 MPH <br /> SNOW LOAD: 15 PSF z SYSTEM SIZE <br /> EXPOSURE CATEGORY: B DC SIZE: 2.580 KW DC-(STC) <br /> AC SIZE: 11.520 KW AC <br /> GENERAL NOTES <br /> SHEET INDEX <br /> PROJECT NOTES: <br /> -THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE PV-1 COVER SHEET <br /> NATIONAL ELECTRIC CODE (NEC)ARTICLE 690, ALL PV-2 SITE PLAN-1 <br /> MANUFACTURER'S LISTING AND INSTALLATION INSTRUCTIONS, METER NO: 1000140775 PV-2.1 SITE PLAN-2 <br /> AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY PV-3 ATTACHMENT PLAN <br /> HAVING JURISDICTION'S (AHJ)APPLICABLE CODES. PV-3.1 STRUCTURAL PLAN <br /> -THE UTILITY INTERCONNECTION APPLICATION MUST BE PV-4 ELECTRICAL <br /> APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL PV-4.1 ELECTRICAL CALCULATIONS <br /> OPERATION PV-5 LABELS <br /> - GROUND FAULT DETECTION AND INTERRUPTION (GFDI) PV-6 RESOURCE DOCUMENT <br /> DEVICE IS INTEGRATED WITH THE SOLAR SHUTDOWN DEVICE PV-6.1 RESOURCE DOCUMENT <br /> IN ACCORDANCE WITH NEC 690.41(B) PV-6.2 RESOURCE DOCUMENT <br /> -ALL PV SYSTEM COMPONENTS; MODULES, PV-6.3 RESOURCE DOCUMENT <br /> UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT PV-6.4 RESOURCE DOCUMENT <br /> COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PV-6.5 RESOURCE DOCUMENT <br /> PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4: PV PV-6.6 RESOURCE DOCUMENT <br /> MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 PV-6.7 RESOURCE DOCUMENT <br /> CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, <br /> 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY <br /> - MAX DC VOLTAGE CALCULATED USING MANUFACTURER <br /> PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX <br /> DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. <br /> -ALL INVERTERS, PHOTOVOLTAIC MODULES,PHOTOVOLTAIC <br /> PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR <br /> USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED <br /> AND LISTED FOR THE APPLICATION PER 690.4. SHALL BE DRAWN BY SWA <br /> INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING <br /> OR LABELING [NEC 110.3]. DATE 12/18/2024 <br /> -ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL REVISION <br /> BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV <br /> RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS IGNATUR- <br /> REQUIRED BY THE NEC AND AHJ. <br /> PV-1 <br /> COVER SHEET <br />