Laserfiche WebLink
FLASHKIT PRO mmere U N I RAC FLASHKIT PRO mommmon U N I RAC <br /> FEATURING O SHED&SEAL TECHNOLOGY INSTALLATION GUIDE FEATURING®SHED&SEAL TECHNGmcY <br /> FLASHKIT PRO is the complete attachment solution for composition shingle roofs.Featuring Unirac's patented FLASHKIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. <br /> SHED & SEAL technology,a weather proof system which provides the ultimate protection against roof leaks. <br /> Kilted in 10 packs for maximum convenience,flashings and hardware are available in Mill or Dark finishes. <br /> With FLASHKIT pro,you have everything you need for a quick,professional installation. <br /> INSTALL FLASHKIT PRO FLASHING INSTALL L-FOOT ATTACH L-FOOTTO RAIL <br /> PRE-INSTALL •Drive the lag bolt down until the L-foot is held firmly in place.It is <br /> normal for the EPDM on the underside of the stainless steel backed <br /> Locate roof rafters and snap chalk lines to mark the installation EPDM washer to compress and expand beyond the outside edge of <br /> paint for each roof attachment. the steel washer when the proper torque is applied. <br /> Drill a 7/32"pilot hole at each roof attachment.Fill each pilot hale TIP: <br /> with sealant. <br /> Use caution to avoid over-torqueingthe lag bolt f using an impact driver. <br /> STEP INSTALL FLASHKIT PRO FLASHING Repeat Steps 1 and 2 at each roof attachment point. <br /> -Add aU-shaped bead of roof sealant to the underside of the flashing STEP3 ATTACH LFOOTTO RAIL <br /> with the open side of the U pointing down the roof slope.Slide <br /> the aluminum flashing underneath the row of shingles directly up Insert the included 3/8"-16 T-bolts into the lower slot on the Rail <br /> slope from the pilot hole as shown.Align the indicator marks on the (sold separately),spacing the bolts to match the spacing between <br /> lower end of the flashing with the chalk lines on the roof to center the roof attachments. <br /> the raised hole in the flashing over the pilot hole in the roof.When <br /> installed correctly,the flashingwill extend under the two courses of Position the Rail against the L-Foot and insert the threaded end of <br /> shingles above the pilot hole. the T-Boltthrough the continuous slot in the L-Foot.Apply anti-seize <br /> to bolt threads to prevent galling of the T-bolt and included 3/8" <br /> serrated flange nut.Place the 3/8"flange nut on the T-bolt and <br /> o-,- <br /> ,. STEP 2 INSTALL L-FOOT finger tighten.Repeat STEP 3 until all L-Feet are secured to the Rail <br /> with aT-bolt.Adjust the level and height of the Rail and torque each <br /> -�owl 4il* F •Fasten L-foot and Flashing into place by passing the included lag boltto 30ft-lbs. <br /> LA bolt and pre-installed stainless steel-backed EPDM washerthrough <br /> TRUSTED WATER SEAL FLASHINGS YOUR COMPLETE SOLUTION CONVENIENT 10 PACKS the L-foot EPDM grommet,and the raised hole in the flashing,into <br /> FEATURING O SHED G SEAL TECHNOLOGY Flashings,lags,continuous slot LFeetand hardware Packaged for speed and ease of handling the pilot hole in the roof rafter. <br />