My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5501 S 2ND AVE 2025-12-01
>
Address Records
>
S 2ND AVE
>
5501
>
5501 S 2ND AVE 2025-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 1:49:42 PM
Creation date
11/20/2025 1:49:42 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PV2504-002 Description: 3.6KW solar system <br /> Applied:4/11/2025 Approved:4/15/2025 Site Address: 5501 S 2ND AVE <br /> Issued:4/15/2025 Finaled: 6/3/2025 City,State Zip Code: EVERETT,WA 98203-4153 <br /> Status: FINALED Applicant:anthony boler <br /> Parent Permit: Owner: IVORY S TREVOR&BOLANOS-IVORY BRENDA <br /> Parent Project: Contractor:ANT POWER LLC(CONST) <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/29/2025 5/29/2025 7EILEC 10-FINAL** PAUL WEILAND PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 5/27/2025 8:04 AM anthony boler <br /> ELECTRICAL PANEL AND SOLAR PANELS <br /> Contact Name:anthony boler <br /> Site Address:5501 S 2ND AVE <br /> Phone:2065505774 <br /> e-Mail:info@antpower.11c <br /> Install approved <br /> 5/29/2025 5/29/2025 ELEC 10-FINAL** PAUL WEILAND CORRECTION <br /> REQUIRED <br /> Notes: <br /> Must have a separate permit for new panel installation. <br /> 6/2/2025 6/2/2025 BLDG 16-FINAL Darold Phinney CORRECTION See notes <br /> REQUIRED <br /> Notes: <br /> 5/29/2025 2:08 PM anthony boler <br /> Contact Name:anthony boler <br /> Site Address:5501 S 2ND AVE <br /> Phone:2065505774 <br /> e-Mail:info@antpower.11c <br /> Inspected from the ground only and from photos from the contractor.Must have a separate permit for new panel installation according to electrical <br /> inspector.Call again for final once all electrical permits are signed off for final. ***** <br /> 6/3/2025 6/3/2025 ELEC 10 FINAL** I PAUL WEILAND I APPROVAL <br /> Notes: <br /> deficiency corrected OK to final <br /> I <br /> Printed:Thursday,20 November,2025 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.