My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5501 S 2ND AVE 2025-12-01
>
Address Records
>
S 2ND AVE
>
5501
>
5501 S 2ND AVE 2025-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 1:49:42 PM
Creation date
11/20/2025 1:49:42 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARUN CORP RESULTS SUMMARY <br /> IVORY EVERETT,5501 S 2ND AVE,EVERETT,WA 98203 <br /> MOUNTING PLANE STRUCTURAL EVALUATION <br /> MOUNTING PLANE ROOF PITCH RESULT GOVERNING ANALYSIS <br /> Roof 1-2 18' MEMBER ANALYSIS <br /> Limits of Scone of work and Liability: <br /> The existing structure has been reviewed based on the assumption that it has been originally designed and constructed per appropriate <br /> codes. The structural analysis of the subject property is based on the provided site survey data. The calculations produced for this <br /> structure's assessment are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were <br /> made according to generally recognized structural analysis standards and procedures.All PV modules,racking and attachment <br /> components shall be designed and installed per manufacturer's approved guidelines and specifications. These plans are not stamped for <br /> water leakage or existing damage to the structural component that was not accessed during the site survey.Prior to commencement of <br /> work,the PV system installer should verify that the existing roof and connections are in suitable condition and inspect framing noted on <br /> the certification letter and inform the Engineer of Record of any discrepancies prior to installation. The installer should also check for any <br /> damages such as water damage,cracked framing,etc.and inform the Engineer of Record of existing deficiencies which are unknown <br /> and/or were not observable during the time of survey and have not been included in this scope of work.Any change in the scope of the <br /> work shall not be accepted unless such change,addition,or deletion is approved in advance and in writing by the Engineer of Record. The <br /> Engineer of Record and Barun Corp claim no responsibility for misuse and improper installation. <br /> Barun Corp I Design and Engineering 1610.202.4506 1 chrisk@baruncorp.com I www.baruncorp.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.