Laserfiche WebLink
IMCO_Reservoir 3 Phase 1_CO No. <br />1_RL_2025.11.05_SD <br />Final Audit Report 2025-11-18 <br />Created:2025-11-12 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAUyvE4XsFqjGkP2WBG_vg_JKvPxUCu5vn <br />"IMCO_Reservoir 3 Phase 1_CO No. 1_RL_2025.11.05_SD" His <br />tory <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2025-11-12 - 7:37:27 PM GMT <br />Document emailed to Randy Loveless (RLoveless@everettwa.gov) for approval <br />2025-11-12 - 7:38:15 PM GMT <br />Email viewed by Randy Loveless (RLoveless@everettwa.gov) <br />2025-11-12 - 7:38:36 PM GMT <br />Document approved by Randy Loveless (RLoveless@everettwa.gov) <br />Approval Date: 2025-11-12 - 7:38:57 PM GMT - Time Source: server <br />Document emailed to tkimberly@imcoconstruction.com for signature <br />2025-11-12 - 7:38:59 PM GMT <br />Email sent to tkimberly@imcoconstruction.com bounced and could not be delivered <br />2025-11-13 - 7:45:07 PM GMT <br />Marista Jorve (mjorve@everettwa.gov) replaced signer tkimberly@imcoconstruction.com with Tyler Kimberley <br />(tkimberley@imcoconstruction.com) <br />2025-11-17 - 11:02:41 PM GMT <br />Document emailed to Tyler Kimberley (tkimberley@imcoconstruction.com) for signature <br />2025-11-17 - 11:02:41 PM GMT <br />Email viewed by Tyler Kimberley (tkimberley@imcoconstruction.com) <br />2025-11-17 - 11:04:34 PM GMT