My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2025 BLDG 40-26 Plans 2025-12-01
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-26
>
Plans
>
3003 W CASINO RD 2025 BLDG 40-26 Plans 2025-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2025 11:43:49 AM
Creation date
12/1/2025 11:43:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-26
Year
2025
Notes
40-26 Traveler Density Upgrade-WET SPRINKLER
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,2%' (ND 3 x a3'/:NIPPLE w/HOSE GATE VALVE&CAP w/CHAIN- BOEING EVERETT FIRE PUMP CONTROL STRATEGY-REVISED 12/06/2023 <br /> H SE GATE VA:POTTER ROEMER FIG,4335-3"FPT x 2%"MHT(NST) ROUGH BRASS FINISH DESIGNATION RATED FLOW RATED PRESSURE CHURN PSI START POINT STOP POINT START DELAY <br /> ° CAP&CHAIN:POTTER ROEMER FIG.4625-2'/r"FHT(NST)-ROUGH R-ASSFINISH <br /> ANVIL STRUT BRKT.x(LENGTH NOTED) (TYP 6) 40-29 JOCKEY NA 151 PSI 160 PSI 0 SEC. <br /> FIELD CUT EXCESS (N)10'WELDED PUMP TEST HEADER 45-51 JOCKEY - NA 144 PSI 157 PSI 0 SEC. <br /> I 4ASUIT10PO'AS <br /> PE CLAMP N <br /> rSTRUT PIPE CLAMP ° a 40-29 SERVICE 1500 GPM 75 PSI NA 145 PSI 155 PSI 0 SEC. <br /> AS-11WAS — --------° ANVIL STRUT BRKT.-18" LINK SEAL <br /> I (N)14"CORE EVNP-1 1500 GPM 75 PSI 148 PSI 140 PSI MANUAL 10 SEC. <br /> x 2'/,'KWIK BOLT(2) EVNP-2 2000 GPM 75PSI 148 PSI 130 PSI MANUAL 15 SEC. <br /> (2) 9 _ N - % e EVSP-1 2500 GPM 130 PSI 145 PSI 120 PSI MANUAL 20 SEC. <br /> - <br /> (E)10'FLGD CROSS\ (N)10 FLG ADAP STYLE 741 EVSP-2 2500 GPM 130 PSI 145 PSI 110 PSI MANUAL 30 SEC. <br /> a° CONCRETE WALL (N)10"FLG ADAP STYLE 741 \ (N)10 x 4-81 FG (N)10 z 2-0,FF EVSP-3 2500 GPM 130 PSI 145 PSI 100 PSI MANUAL 40 SEC. <br /> CONCRETE PAD EVSP4 2500 GPM 130 PSI 145 PSI 95 PSI MANUAL 50 SEC. <br /> (E)10"SR FLGD 90° �(E)10"SR FLGD 90' EVSP-5 2500 GPM 130 PSI 145 PSI 90 PSI MANUAL 60 SEC. <br /> HANGER#102 HANGER#103 FIRE PUMP SET POINT NOTES: <br /> SIDE VIEW SIDE VIEW (N)10x0-8,FF 2'-6" (N)10x0-8,FF THE FLOOR OF THE 45-51IS-10 FT.HIGHER THAN THE 40-29 FLOOR.CONSEQUENTLY,STATIC PRESSURE IN THE 40-29 IS-4 PSI <br /> w HIGHER THAN STATIC PRESSURE IN THE 45-51.ACCORDINGLY,THE 45-51 JOCKEY STOP PRESSURE WAS ADJUSTED TO EQUAL THE <br /> 1'/:"=1"-0" 1'/:"=1%0" LL E2 z 40-29 JOCKEY STOP PRESSURE. <br /> a o JOCKEY PUMP SET POINTS ARE DESIGNED TO MAINTAIN STATIC SYSTEM PRESSURE ABOVE DIESEL FIRE PUMP START SET POINTS. <br /> (E)10 x 10 x 6 0 o w o w ,}, w a (E)10 x 10 x 6 FLGD TEE ELECTRIC SERVICE PUMP SET POINTS ARE DESIGNED TO MAINTAIN RESIDUAL SYSTEM PRESSURE ABOVE DIESEL FIRE PUMP START <br /> E ke <br /> M o o x m z SET POINTS AT SUBSTANTIAL SYSTEM FLOW.SERVICE PUMP HAS A RUN TIME SETTING OF 300 SECS AFTER THE PUMP STOP SET <br /> wos�� <br /> Y y J o 0 co POINT IS ATTAINED.RUN TIME RESETS IF PRESSURE DROPS TO START SET POINT. <br /> (N)10x1-5,FF <br /> 0 0 ��;�• a •DIESEL FIRE PUMP PROGRESSIVE START DELAYS ARE DESIGNED TO PREVENT SIMULTANEOUS STARTING OF MULTIPLE DIESEL FIRE <br /> * FOR � �QKS' �ozg� QV PUMPS.IFSTARTPOINTPRESSUREISATTAINEDDURINGDELAYPUMPWILLNOTSTARTANDSTARTDELAYWILLRESET. <br /> x10�o0o Jo�� ` Q��yQ o�o (E)10x6x10 wNa ? �osz� Oo (E)10x8x10FLGDTEE <br /> �oQ�, \\'---/ FLGD TEE �woayxoz 3 <br /> NOTES(GENERAL): <br /> ro o Qw 1.DESIGN STANDARDS:NPFA 20,2010 ED.,BOEING EVERETT FIRE DEPT.&BOEING EVERETT FACILITIES <br /> �.xz 3 Q z�tnz 3 <br /> 2.SCOPE- <br /> V I EW 'LAII DEMO(3)FIRE PUMPS AND ASSOCIATED CONTROLLERS-(2)JOCKEY PUMPS AND ASSOCIATED CONTROLLERS-(1)COMPRESSOR- <br /> (1)PRESSURE TANK AND APPURTENANCES-ALL WIRING AND ASSOCIATED PANELS,BOXES,ETC.WITHIN THE ENCLOSURE- <br /> REPLACE(3)FIRE PUMPS AND CONTROLLERS-(1)JOCKEY PUMP AND CONTROLLER--(1)TEST DISCHARGE HEADER-(3)BUTTERFLY TYPE SUCTION <br /> CONTROL VALVES wl SAME-(3)BUTTERFLY TYPE DISCHARGE CONTROL VALVES wl SAME-(3)BUTTERFLY TYPE TEST VALVES wl 01 TYPE GATE <br /> p �e LOOKING SOUTH VALVES-ALL WIRING AND ASSOCIATED PANELS,BOXES,ETC.WITHIN THE ENCLOSURE PER CONSTRUCTION DOC.S PREPARED BY THE SAZAN GROUP <br /> HYDRAUL11C � 6 s %"=P-0l 3.PIPE(WATER):PIPE IS TO BE STEEL,BLACK,SCH 40 PIPE(FUEL OIL):AS NOTED ON PLAN <br /> w� 4.FLANGES:ALL WELDED FLANGES,FLANGED FTG.S&FLANGE ADAPTORS ARE TO BE 125#PATTERN <br /> - '3= - <br /> � 5.GROOVED MATL:GROOVED CPLG.S&FTG.S ARE TO BE VICTAULIC BRAND-FITTINGS:FIRELOCK UNLESS OTHERWISE NOTED- <br /> sW�� �a <br /> SIS a N COUPLINGS:RIGID UNLESS OTHERWISE NOTED-FINISH:FACTORY ORANGE PAINT <br /> 6.SUPPORTS:AS DETAILED ON THE PLANS <br /> rs� € <br /> ke <br /> e oz ke wJ5 <br /> w <br /> z w <br /> z a o �o � K�� o 0 <br /> V <br /> INFORMATION . .. <br /> - >a � Imo �� �� � <br /> w <br /> --°-.- �'�•�� <br /> e <br /> a <br /> -. x@xe�_ � " cap a �m� o ti wo�� <br /> e�e�Ph. w� o <br /> `a IlH - z"znu,cc LL z�V o o moo o¢ LL ZRra LL <br /> V �z"o-s,cc px"nsminm 2 ��R E2 J Wcaay " o �o<� <br /> mW"w%zrFusln LL N zroo� o�0� LL <br /> °C im snvrrurs3WesReRxaTa s �-x z 3 �l c x x <br /> roo_ <br /> USE ONLYe -Q <br /> a a44 o <br /> PAD EXTENSION- <br /> Q. <br /> e <br /> 0 o TOP OF PAD EXTENSION TO MA CH T P OF E PAD- <br /> a 'NSTALL 4'/:"KWIK BOLTS INS S&�3 IN�ND OF <br /> a. a NEW HOUSEKEEPING 4x0-6,TxF �O= D 'E)PAD�OANCHOREXTENSIO ) <br /> . PAD-SEESHTFP3SHTFP3LU <br /> HIGH TEMP GASKET ---- <br /> HIGH TEMP GASKET <br /> Ba a, iio <br /> 4 x 0-6,TxF - <br /> a a MUFFLER D  MUFFLER :E4 <br /> Ed z w o 4x0 T — j\ li f 4x04,TBE <br /> HRH �`Lj V5 s - <br /> Z - <br /> NwZ <br /> Y� 00 000 O 1 <br /> 2 2 2 v� 06 - - F Y NEW 6"TOPPING PAD- V <br /> 2-0 3 0-113/: TG e z MATCH DIMS OF(E)PAD- FILL E))"'EXHAUST <br /> F a <br /> 2"FIRELOCK 0° a �i SEEVIEW'D" PENNTIONw/GROUT I— j <br /> 243%,GG o a a Q c�a �x�n - - --------- —' d <br /> 3x2CONC-RED.#50- 2 <br /> YS STYLE FLG o 06 4 �? x <br /> - HGR#103 o w END TO END BATTERY BOX c� <br /> 2"FIRELOCK 9° EVNP 2 " ON 12"HIGH STAND- EVNP 1 <br /> wmo� ELECTRIC SERVICE PUMP SEE DETAIL SHT.3 DIESEL <br /> 3x2CONC. D.#50- GG DIESEL 1500GPM@75PSI 3"STYE 741 G ADAP s <br /> O O 0 0 2000 GPM @ 75 PSI 1500 GPM @ 75 PSI < SO U R C E <br /> 3'OS&Y DISC ARGE(E) J <br /> BEYOND � cD - _- NOTE:DEMO E)1 PAD DOWN TO THE BLAB-FORM AND POUR((N PAD <br /> w �, �co TODIM.SANDVS INDICATED-INSTALL 33/<"ANCHORS ASINDICA <br /> 3'OS&Y S CTION(E) 9 o TO TIE(N)PAD TO SLAB-SEE SLAB PLAN SHEET FP3 <br /> am <br /> VOID <br /> START I STOP SETTINGS: <br /> 1 0 j JOCKEY:START I STOP-140 PSI 1150 PSI EVNP 1 <br /> i + CONTROLLER SERVICE(ELECTRIC 1500 GPM 75PSI:START I STOP PSI 145 PSI SERVICE PUMP CONTROLLER <br /> Fl <br /> @ ) CONTROLLER <br /> EVNP 1(DIESEL-1500 GPM @ 75 PSI):START I STOP-125 PSI I MANUAL <br /> 1%"z1-OSTRUT(2)- EVNP 2(DIESEL-2000 GPM @75PSI):START ISTOP-115 PSI IMANUAL <br /> 12 <br /> / __ __ ATTACH STRUT wl%x2YKB(2)- <br /> 4° GG ATTACH PUMP wl%x 2 BOLTS, <br /> p STRUT NUTS&WASHERS <br /> 4 a <br /> a Qa a VIEW°J°4 a a sa°a �N <br /> 40-29 PUMP HOUSE PLAN AS BUILT <br /> 1"=T-T '/"=1,0" L City of Everett Permit Services 3/4/2015 <br /> EVERETT Reviewed for Permit 03/14/2025 <br /> N ABBREVIATIONS SPRINKLER LEGEND WATER SUPPLY INFORMATION REVISIONS STAMP ��'�'77777/.r PROJECT: BOEING <br /> AFF-CENTERLHEABDVIIFINISH FLOOR SYMBOL MAKE MODEL STYLE S.I.N. TEMP. N.P.T. K-FCTR. CANOPY FINISH TOTAL STATIC: NO. DATE BY DESCRIPTION Klzie <br /> 9FC_CENTERLINE BELOW FINISH CEILING RESIDUAL: 916/23 DM EACH PUMP:ADJUSTED START DELAY, l "`�V./ 40-29 PUMP HOUSE <br /> BOB-CENTERLINE BELOW BOTTOM OF BEAM <br /> sac.CE TERLINEBELOWBOTTOMOFCHANNEI FLOWING: DATE&TIME FIREPROTECTION STORM DAMAGE RECOVERY <br /> BOO CENTERLINE BELOW BOTTOM OF DECK <br /> Ba-CENTERORE BELOW BOTTOM OFJ06T DATE: �1216/23 DM ADJUSTED START/STOP PRESSURES FOR 45-51 VIKING AUTOMATIC SPRINKLER COMPANY EVERETT,WA <br /> BOP-CENTERLINE BELOW BOTTOM OF PURLIN <br /> W E BTJ-CENTEa LINE BELOwTOPOFJOIST LOCATION: JOCKEY PUMP-ADJUSTED DELAYS FOR EVNP-1 3434 FIRST AVENUE SOUTH <br /> COJ-CUTONJOB PORTLAND SEATTLE,WA.98134 LONGVIEW <br /> DOE-GROOVEONEEND PROVIDED BY: AND EVNP-2 MEDFORD MERIDEAN PLAN,ELEVATIONS"A"&"B",DETAILS <br /> TOE-1HREAD ONE ENO SEATR PHONE:206 622-4656FAX:206E ( ( )622-9319 POCATELLO <br /> GG.GRODVESGROOVE FIRE PUMP INFORMATION CCBO#:VIKINAS373NT <br /> TcZEAD,GROOVE <br /> T-T.THREAD,THREAD PUMP TYPE: I DATFDRAWN: DRAwN ev: SHEET NUMBER <br /> N.C,NOTINCONTRACT THIS DRAWING IS THE PROPERTY OF VIKING AUTOMATIC SPRINKLER COMPANY. 09_13 DAN MCLUEN,PE <br /> 101GRODWOLET)GROOVED WELDED OUTLET) TOTAL SPRINKLERS THIS SHEET: RATED PRESSURE: APPROVING AUTHORITIES IT IS SUBMITTED IN CONFIDENCE AND IS NOT TO BE DISCLOSED OR UTILIZED <br /> S PO.L PIPE.0 LET(THREADED WELDED OUTLET) SCALE: PRWECT NUMBER: FP 1 OF 5 <br /> TOTAL SPRINKLERS THIS PROJECT: RATED GPM: WITHOUT THE WRITTEN PERMISSION OF VIKING AUTOMATIC SPRINKLER COMPANY. AS NOTED WST-3719 <br />
The URL can be used to link to this page
Your browser does not support the video tag.