Laserfiche WebLink
July 2, 2008 <br />Duplex Buildings <br />L&A Job No. 8AO67 <br />Page 17 <br />the drain lines should have a sufficient gradient (0.5% minimum) to generate flow by gravity. <br />The drain lines should be fitted with a non -woven filter fabric sock and completely enclosed in <br />clean washed gravel. The remaining trench may be backfilled with clean onsite soils. Water <br />collected by the perimeter footing subdrain systems should be tightlined, separately from the roof <br />and surface stormwater drain lines, to discharge into a storm sewer or suitable stormwater <br />disposal facilities. <br />Surface Drainage <br />Water should not be allowed to stand in any areas where footings, on -grade slabs,. or pavement is <br />to be constructed. Finish ground surface should be graded to direct surface runoff away from the <br />proposed triplex building. We recommend the finish ground be sloped at a gradient of 3 percent <br />minimum for a distance of at least 10 feet away from the building, except in the areas to be <br />paved. <br />Cleanouts <br />Sufficient number of cleanouts at strategic locations should be provided for underground drain <br />lines. The underground drainlines should be cleaned and maintained periodically to prevent <br />clogging. <br />RISK EVALUATION STATEMENT <br />The subject site is underlain at shallow depth by very -dense fresh till and/or dense advance <br />outwash soils. These soils are of very -high to high shear strength and the site should be quite <br />stable. It is our opinion that if the recommendations in this report are fully implemented and <br />observed during construction and following the completion of construction, the areas disturbed <br />by construction will be stabilized and will remain stable, and will not increase the potential for <br />LIU & ASSOCIATES, INC. <br />