My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7203 UPPER RIDGE RD 2025-12-16
>
Address Records
>
UPPER RIDGE RD
>
7203
>
7203 UPPER RIDGE RD 2025-12-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 8:17:38 AM
Creation date
12/3/2025 11:51:50 AM
Metadata
Fields
Template:
Address Document
Street Name
UPPER RIDGE RD
Street Number
7203
Notes
ERNEST KELLER 7203 UPPER RIDGE RD; EXPIRED SEE 1202-2010-006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />• a MIN <br />Receipt # <br />Vf <br />Contact Person <br />Requested By <br />Cost of Work Order <br />Cost of Service Order <br />Ernest Keller <br />Gordon Witcher <br />Property Owner (name) Keller <br />Charge Cost to (name if different than owner) <br />[F�gugu\V[20 <br />APR 12 2007 <br />............................................. <br />CITY OF EVERETT <br />Engineering/Public Services <br />Date Paid <br />4,085.00 Work Order# <br />Service Order # <br />Telephone # 541-350-4628 <br />Date of Request <br />Address 1205 Walnut St West City The Dalles, OR Zip 97058 <br />Installation Location 7203 Upper Ridge Road <br />Installation type/description/size/etc. Hydrant relocate. Relocate hydrant to N.E. prop corner. <br />Hydrant must be replaced. City to credit tapping sleeve, control valve,'/z cost of hydrant and 3 <br />hrs labor for -crew* <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />2,750.00 <br />2,187.00 <br />528.00 <br />96.00 <br />5,561.00 <br />-1,476.00 <br />$4,085.00* <br />Prepared by: Gerry Crum Estimate Prepared <br />Accepted by: <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welborn <br />Benyam Stephanos <br />Gerry Crum <br />Dennis Roberson <br />Cliff Lindman <br />Randy Allen <br />4-11-07 <br />S:\#Common\clerical\Cost.esl\7203Upper Ridge Road.DOC 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.