My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2496-00
>
Ordinances
>
Ordinance 2496-00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2014 2:38:42 PM
Creation date
4/2/2014 2:38:40 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2496-00
Date
12/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2: General Requirements for Fees Related to System Improvements <br /> number of trips generated: level of service at horizon year: fee calculation: <br /> fewer than 10 new vehicle trips <br /> per day (not applicable;no traffic study) 0 <br /> more than 10 new vehicle trips <br /> per day,but less than 50 additional (not applicable;no traffic study) $900 for each peak hour trip <br /> peak hour trips* <br /> more than 50 additional 1. fee for fair share of planned system <br /> peak hour trips* improvements(e.g.,identified in the <br /> City's 6-year transportation <br /> improvement program) 4 $900 for each peak hour trip <br /> plus: plus: <br /> 2. fair share of additional <br /> improvements, if any,to maintain <br /> acceptable levels of service as a result <br /> of the proposed project,as follows: <br /> If"D"or better at horizon year and no <br /> need for additional improvements <br /> (taking growth into account) 4 0 <br /> Project alone causes need for <br /> additional improvements at horizon <br /> year(no need if project did not occur, <br /> taking growth into account) 4 100%of cost of improvements <br /> Additional improvements needed to project's%of total peak hour <br /> maintain"D"or better at horizon trips at horizon year,minus <br /> year,due to project and growth 4 existing peak hour volume <br /> Additional improvements needed at <br /> horizon year due to project and <br /> growth,but current level of service is project's%of total peak hour <br /> "E"or"F" 4 trips at horizon year <br /> *for proposed projects in core area <br /> (Exhibit 1),trip calculation at 50% (not applicable;no traffic study) $900 for each peak hour trip <br /> of ITE Trip Generation Manual (phased in from 1999-2004) <br /> Section 10: Fair share for system improvements <br /> 10.1. Two components of fair share. This section specifies the mitigation for transportation <br /> system improvements, unless otherwise agreed by the City Engineer. The fair share shall <br /> consists of two components: <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.