My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/12/03 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/12/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 9:17:33 AM
Creation date
12/4/2025 9:11:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/3/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Page 47 of 58 <br /> <br />SECTION 5 – ACRONYMS & DEFINITIONS <br />AISC: American Institute of Steel Construction. <br />ALI: American Lift Institute. <br />AMS: Aerospace Material Specifications. <br />ANSI: American National Standard Institute. <br />API: American Petroleum Institute. <br />ASME: American Society of Mechanical Engineers. <br />ASTM: American Society for Testing and Materials. <br />AWS: American Welding Society. <br />BCI: Battery Council Institute. <br />Bidder: see “Supplier”. <br />CFR: Code of Federal Regulations. <br />City: refers to the City of Everett (“COE”), located in Washington State. <br />CMOM: Capacity, Management, Operations, and Management. <br />Code Requirement: all applicable requirements of the City of Everett Municipal Code (EMC) Title 16, along with <br />any applicable codes including, but not limited to, International Mechanical Code, International Plumbing Code, <br />and International Energy Conservation Code. EMC Title 16 can be found here: <br />https://everett.municipal.codes/EMC/16 <br />Contractor: see “Supplier”. <br />Contract Administrator: see “Procurement Professional”. <br />Cost Analysis: comparison of offered price to the offeror’s own costs and evaluation of the difference (profit). <br />Desired Features: features that a requested commodity or solution does not have to possess to be considered <br />responsive. However, inclusion of such features are considered value added qualities that may lead to a higher <br />level of success and evaluation score for the proposal response. These are in addition to the salient characteristics <br />included in the solicitation. <br />DOT: Department of Transportation. <br />EPA: Environmental Protection Agency. <br />Equipment: an assembly of machines and components in a logical manner that works systematically to provide <br />an intended, conditioned environment for the facility. <br />ESRI: Environmental Systems Research Institute, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.