My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1215 80TH ST SW 2026-01-12
>
Address Records
>
80TH ST SW
>
1215
>
1215 80TH ST SW 2026-01-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2026 9:55:50 AM
Creation date
12/8/2025 10:03:07 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N Nl ' <br /> nr _ , <br /> HiM PROMS Engineering 3.t3.76 <br /> www.hlfti.com <br /> Company. Engineers North�vest Page. 8 <br /> Address: 9725 3rd Ave N E STE*207 Specifier <br /> Phone 1 Fax: <br /> E-flail: <br /> Design: Concrete-Apr 1,2022(7) Dale: <br /> Fastening point: 4/1/2022 <br /> 6 Warnings �_.._... <br /> • The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations(AS 5216:2021.ETAG 001/Annex C, <br /> EOTA TR029 etc.).This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered-the <br /> anchor plate is assumed to be sufficiently stiff,in order not to be deformed when subjected to the design loading.PROFIS Engineering calculates <br /> the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions explained above.The <br /> proof if the rigid archor plate assumption is valid is not carried out by PROFIS Engineering.Input data and results must be checked for <br /> agreement with the existing conditions and for plausibility! <br /> • Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the potential <br /> concrete failure prism into the structural member.Condition B applies where such supplementary reinforcement is not provided,or where pullout <br /> or pryout strength governs. <br /> • For additional information about ACI 318 strength design provisions,please go to hitps:l(submittals.us.hilti.com/PROFISAnchorDesignGuidef <br /> • An anchor design approach for structures assigned to Seismic Design Category C,O.E or F is given in ACI 318-14.Chapter 17.Section <br /> 17.2.3.4.3(a)that requires the governing design strength of an anchor or group of anchors be limited by ductile steel failure.If this is NOT the <br /> case.the connection design(tension)shall satisfy the provisions of Section 17.2.3.4.3(b).Section 17.2.3.4.3(c),or Section 17.2.3.4.3(d).The <br /> connection design(shear)shall satisfy the provisions of Section 17.2.3.5.3(a).Section 17.2.3.5.3(b),or Section 17.2.3.5.3(c). <br /> - Section 17.2.3.4.3(b)/Section 172.3.5.3(a)require the attachment the anchors are connecting to the structure.be designed to undergo ductile <br /> yielding at a load level cturesponding to anchor forces no greater than the controlling design strength.Section 17,2.3,4.3(c)/Section 17.2.3.5.3 <br /> (b)waive the ductility requirements and require the anchors to be designed for the maximum tension/shear that can be transmitted to the <br /> anchors by a non-ylekiing attachment.Section 17.2.3.4.3(d)1 Section 17.2.3.5.3(c)waive the ductility requirements and require the design <br /> strength of the anchors to equal or exceed the maximum tension/shear obtained from design load combinations that include E,with E increased <br /> by wa. <br /> Fastening meets the design criteria? <br /> .................... _._.____............................... <br /> _._v..__. <br /> Input data and results must tx checked tar conformity with the ex:st,ng conxie ans and!or ptausiwlip! <br /> PROFIS Engneenng(c)2003-2022 PA AG.FL-904 Schaan HAti is a registerod Tradeanarx of until AG.Schaan <br />
The URL can be used to link to this page
Your browser does not support the video tag.