My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 95 - 2 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br />00 63 95 - 2 CHANGE ORDER - UNILATERAL <br />Change Order No._________________________ <br />Change Order Effective Date:________________ <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. The Contract Sum shall be adjusted as described in this Change Order. <br />3. The Contract Time of the Contract, and contractually scheduled completion date, <br />shall be adjusted to the extent described in this Change Order. <br />4. Unless the Contractor timely and properly follows the procedures in the Contract <br />Documents for seeking further equitable adjustment of time and compensation, <br />including, but not limited to, delays, impacts, inefficiencies, overhead, and direct and <br />indirect costs, and except as otherwise expressly provided herein, the Contractor will <br />be barred from (a) asserting any claim for further adjustment of time and <br />compensation arising out of, or relating to, the charges described in this Change <br />Order or Work described in Exhibit A and (b) asserting an equitable adjustment of <br />time or price arising earlier than the date of this Change Order. This provision does <br />not apply to requests for equitable adjustment of time or price for which the <br />Contractor timely and properly provided notice of a differing site condition, protest, <br />dispute, claim or Contract Claim as required by the Contract Documents. If the <br />Contract Documents establish a time period for notice of a differing site condition, <br />protest, dispute, claim, or Contract Claim that ends after the date of this Change <br />Order, but relates to work performed prior to the date of this Change Order, then this <br />provision does not apply if the Contractor timely and properly submits such notice. <br />5. This Change Order only changes the Contract between Contractor and City to the <br />extent explicitly provided herein
The URL can be used to link to this page
Your browser does not support the video tag.