My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 2 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 2 GENERAL CONDITIONS <br />Contract Claim: Any request by the Contractor for additional time or money (adjustment of Contract <br />Sum or Contract Time) irrespective of the cause or reason for the request. Contract Claims include, but <br />are not limited to, requests by the Contractor for additional time or money due to Extra Work, <br />inefficiencies, Delays, interferences, and problems with the design. Contract Claim includes, but is not <br />limited to, claims or requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br />Sum, additional compensation that the Contractor attempts to pass through or assert against the Owner, or <br />claims against the Owner arising out of a third party’s claim against the Contractor. <br />Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor for <br />the Work described in the Contract Documents, as modified by any Change Orders. <br />Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br />Orders. <br />Contractor: The individual or entity with whom Owner has entered into the Agreement. <br />Day: Calendar day, unless explicitly stated otherwise. <br />Delay: Any increase of the duration of the critical path of the Project. <br />Dispute: Any controversy or disagreement. <br />Drawings: That part of the Contract Documents that graphically shows the scope, extent, and character of <br />the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not <br />Drawings as so defined. <br />Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br />Engineer: An individual or entity retained by the Owner to be the Owner’s representative with regard to <br />matters of design intent. The terms “Owner’s Representative”, “Engineer” and “Architect” are <br />interchangeable. <br />Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving parts, or <br />devices requiring an electrical, pneumatic, electronic, or hydraulic connection. <br />Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. <br />Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, <br />or implied by, the Contract Documents, such that Contractor would be entitled to an adjustment of <br />Contract Sum and possibly an extension of Contract Time. <br />Field Order: A written order issued by Owner’s Representative that requires minor changes in the Work, <br />but does not involve a change in the Contract Sum or the Contract Time. <br />Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br />has been completed, except for any landscaping maintenance. <br />Float: The amount of time between the early start date and the late start date, or the early finish date and <br />the late finish date of any activity in the project schedule. <br />Force Account: Costs of performing Work as defined in 9.6. FORCE ACCOUNT. <br />Furnish, Install, Perform, Provide, Supply: The word "Furnish" or the word "Install" or the word <br />"Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage <br />thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, <br />equipment, and everything necessary to perform the Work indicated, unless specifically limited in the <br />context used. <br />General Conditions: This Section 007200 of the Contract Documents. <br />May: Conduct that is permitted, but not required. <br />Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br />date or time prior to Substantial Completion of all the Work.
The URL can be used to link to this page
Your browser does not support the video tag.