My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 20 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 20 GENERAL CONDITIONS <br />If requested by the Owner’s Representative, the Contractor shall prepare a proposed schedule revision <br />demonstrating a plan to make up the lag in progress and insure completion of the Work within the <br />Contract Time. All actions taken to return the Project to the accepted schedule are at the Contractor's <br />expense. <br />The Contractor shall pay all costs incurred by the Owner that result from the Contractor's action to return <br />the Project to its accepted schedule, including, but not limited to, additional, overtime, or third party <br />inspection, design and construction management service costs. Contractor agrees that Owner shall deduct <br />such charges from payments due the Contractor. It is further understood and agreed that none of the <br />services performed by the Owner’s Representative in monitoring, reviewing and reporting Project status <br />and progress shall relieve the Contractor of responsibility for planning and managing construction Work <br />in conformance with the construction schedule. <br />5.2.4. Delays <br />5.2.4.1 General <br />In the event of a Delay, the Contractor shall take immediate steps to minimize the Delay or avoid further <br />Delay. The Contractor agrees it shall not make any Contract Claim or request for adjustment of Contract <br />Time or Contract Sum based upon Delays for which it did not timely provide Notice to the Owner. <br />5.2.4.2 Bonuses <br />If the Contract Documents provide the Contractor with a bonus or other incentive for early completion of <br />a milestone or other completion point, Contractor assumes the risk of Delays caused wholly or partially <br />by third parties. Owner shall not pay any bonus that Contractor would have achieved but for any and all <br />Delays caused in whole or in part by a third party. By way of example only, the Contractor bears the risk <br />of utility companies’ failure to locate underground utilities accurately and the Contractor bears the risk of <br />timely asking for the marking of the location of underground utilities. <br />5.3. SUSPENSION PROCEDURES <br />The Owner may, at its convenience and at any time and without cause, suspend all or any part of the <br />Work by notice in writing to the Contractor. The Work shall be resumed by the Contractor within five (5) <br />days after receiving written notice from the Owner to do so. The Contractor will be allowed an increase <br />in the Contract Sum or an extension of Contract Time, or both, directly attributable to any suspension in <br />accordance with the Change Order procedures herein; provided, (1) the Contractor shall not be entitled to <br />any increase to the extent caused by the Contractor and (2) Contract Sum increases and Contract Time <br />extensions for suspension caused by Third Parties or Force Majeure Events are limited as set forth in <br />12.4.3.4 Third Party Caused Delays and Force Majeure. <br />5.4. TERMINATION PROCEDURES <br />5.4.1. Termination by Owner for Default <br />The Owner may terminate the Contract upon written notice to Contractor and its surety whenever the <br />Contractor is deemed to be in default or fails to fulfill, in a timely and proper manner, one or more <br />Contract obligations, or is in violation of any provisions or covenants of the Contract. Termination shall <br />be effective upon receipt of such notice by the Contractor. <br />For purposes of this paragraph, the Contractor shall be deemed to be in default upon the occurrence of <br />any one or more of the following events: <br />1. If Contractor is bankrupt or insolvent. <br />2. If Contractor makes a general assignment for the benefit of creditors. <br />3. If a trustee or receiver is appointed for Contractor, or for any of Contractor's property. <br />4. If Contractor files a petition to take advantage of any debtor's law, or to reorganize under any <br />bankruptcy chapter or law.
The URL can be used to link to this page
Your browser does not support the video tag.