My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 45 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 45 GENERAL CONDITIONS <br />6. An event occurs, or fails to occur, that the Contractor believes, or should reasonably foresee, may <br />result in a Contract Claim; <br />the Contractor shall immediately give Notice to the Owner or Owner’s Representative as provided in this <br />section and elsewhere in the General Conditions and Specifications. <br />Timely and adequate Notice is a condition precedent to a Contract Claim. <br />Requests for extensions of Contract Time must be made and will be evaluated in accordance with 5.2.2.2 <br />Extensions of Contract Time. <br />Irrespective of any request for additional compensation or Contract Time or any Contract Claim that work <br />is extra and not part of the original scope of Work, the Contractor shall proceed expeditiously and <br />promptly with the work as the Owner orders. <br />If the Contractor fails to follow the procedures of this Contract, including failing to give Notice, the <br />Contractor completely waives such Contract Claim. In its sole discretion, the Owner may waive strict <br />compliance with procedures, but any such waiver of one or more items or elements does not waive the <br />necessity for Contractor’s strict compliance with any other item or element, nor shall such waiver be <br />admissible in any legal proceeding for any reason. <br />10.2 FORM OF NOTICE <br />The Notice must include the following minimum information: <br />1. A complete and accurate description of the event or events giving rise to the Notice, including <br />dates, times, and locations; <br />2. A preliminary list of persons of involved in such event; <br />3. A statement whether the Contractor believes the event may result in a Contract Claim for <br />additional Contract Time or adjustment of the Contract Sum; <br />4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br />section. <br />10.3 SUPPLEMENTAL INFORMATION <br />Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br />following: <br />1. The date of the event, incident, direction, and other pertinent information; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The Contract provisions relating to, but not limited to, the event, incident, and direction; <br />4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate was <br />determined; and <br />5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br />asserting a schedule change or disruption. <br />Throughout any work related to a Notice, the Contractor shall keep complete and accurate records of <br />costs, expenses, and time incurred for which Contractor will or may seek an adjustment. Contractor <br />waives and is stopped from seeking an adjustment of Contract Sum or Contract Time where Contractor <br />fails to keep and maintain cost, timekeeping, and scheduling records segregated and contemporaneously <br />allocated to the subject work for which an adjustment is sought. For example, failure to keep <br />contemporaneous labor and equipment time records specifically and only allocated to each item of <br />claimed Extra Work shall constitute a waiver of any Contract Claim for reimbursement or additional <br />Contract Time for each such item of Extra Work. The Contractor shall permit the Owner access to these <br />and any other records needed for evaluating requests for additional Contract Time or Contract Sum.
The URL can be used to link to this page
Your browser does not support the video tag.