My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 48 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 48 GENERAL CONDITIONS <br />6. Identification of any documents and the substance of any oral communications that support the <br />Contract Claim. <br />7. Copies of any identified documents that support the Contract Claim, other than Owner documents <br />and documents previously furnished to the Owner by the Contractor. Standard industry manuals <br />may be incorporated by reference. <br />8. If Contractor seeks an extension of Contract Time: <br />a. The specific amount of time (including days and dates) sought. <br />b. The specific reasons the Contractor believes an extension of Contract Time should be <br />granted, including, but not limited to, compliance with the requirements of 5.2.2.2 <br />Extensions of Contract Time; and <br />c. The specific provisions of the Contract Documents under which it is sought. <br />9. If Contractor seeks an increase in the Contract Sum, the exact amount sought and a breakdown of <br />that amount into the following categories: <br />a. Labor <br />b. Materials <br />c. Direct Equipment. The actual cost for each piece of equipment for which a Contract Claim is <br />made or in the absence of actual cost, the rates established by the AGC/WSDOT Equipment <br />Rental Agreement that was in effect when the work was performed. In no case shall the <br />amounts sought or paid for each piece of equipment exceed the rates established by the <br />Equipment Rental Agreement even if the actual cost for such equipment is higher. The <br />Owner may audit the Contractor’s cost records to determine actual equipment cost. The <br />following information shall be provided for each piece of equipment: <br />i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 “G”, Tractor <br />Crawler ROPS & Dozer Included Diesel) <br />ii. The hours of use or standby; and <br />iii. The specific day and dates of use or standby; <br />iv. Job Overhead. <br />v. Overhead (general and administrative). <br />vi. Subcontractor’s contract claims (in the same level of detail as specified herein is <br />required for all Subcontractor’s contract claims); and <br />vii. Other categories as specified by the Contractor or the Owner. <br />10. A notarized statement shall be submitted to the Owner's Representative containing the following <br />language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br /> <br />______________________________, ______________________________ <br /> (name) (title) <br />of ____________________________________________________________ <br /> (company)
The URL can be used to link to this page
Your browser does not support the video tag.