My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00 - 12 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />01 11 00 - 12 SUMMARY OF WORK <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />d) Installation of new 24-inch diameter pipe within the structure, to <br />connect two of the existing chambers. <br />1. Installing an orifice plate on the northern side of the new 24- <br />inch diameter pipe. <br />3) Electrical <br />a) Power for five electric actuators for the Area 50 slide gates. <br />4) Instrumentation and Controls <br />a) Integration of slide gate actuators into the site control system. <br /> <br />11. Area 55 Secondary Combined Sewer Storage <br />a. Area 55 Secondary Combined Sewer Storage will serve as a <br />temporary storage basin for combined sewer flows. When the volume <br />of flow routed to the site exceeds the capacity of Area 30 Primary <br />Storage, flow will be diverted to the Area 50 Distribution Structure, then <br />to Area 55 Secondary Storage. Modifications need to convert the <br />existing secondary clarifier into the Area 55 Secondary Storage <br />structure includes work from structural, process mechanical, electrical, <br />and instrumentation and controls disciplines. <br />1) Structural <br />a) Installation of two sets of stairways and platforms along the <br />external structure of the basin to provide access to a water <br />cannon for basin washdown (see process mechanical <br />improvements). <br />2) Process Mechanical <br />a) Routing and installation of 4-inch diameter process water piping <br />for conveyance of plant water (2W) to water cannons (item 2). <br />b) Installation of three pedestal mounted pressurized water <br />cannons around the perimeter of the Area 55 basin. <br />3) Electrical <br />a) Routing power for proposed instrumentation. <br />4) Instrumentation and Controls <br />a) Installation and integration of the following Area 55 <br />instrumentation types into the site control system. <br />1. Radar level <br />2. Level float switches <br />
The URL can be used to link to this page
Your browser does not support the video tag.