Laserfiche WebLink
City of Everett 00 43 36 - 1 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br />SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br />1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br />18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br />installation and rebar installation, Bidder MUST either identify itself or Subcontractors in <br />the chart below. If Bidder believes such work is not part of the Work, Bidder shall write <br />“NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br />unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br />which Subcontractor will be used for which alternate. <br />3. Bidder’s Bid shall be deemed non-responsive and void if: <br />A. For heating, ventilation and air conditioning, plumbing, electrical work, structural <br />steel installation and rebar installation, Bidder fails: (1) to submit as part of the <br />Bid the names of such Subcontractors; (2) to name itself to perform such Work; <br />or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same Work. <br />4. The requirement to name the Bidder's proposed heating, ventilation, air conditioning, <br />plumbing, electrical, structural steel installation and rebar installation subcontractors <br />applies only to proposed heating, ventilation, air conditioning, plumbing, electrical, <br />structural steel installation and rebar installation subcontractors who will contract directly <br />with the general contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, and electrical portions of the <br />chart below must be submitted with the bid proposal or within one hour of the published <br />bid submittal time. <br />6. The structural steel installation, rebar installation, and pile installation portions of the <br />chart below must be submitted with the bid proposal or within forty-eight hours of the <br />published bid submittal time. <br />Type/Scope of Work Name and Address of Subcontractor or Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br />