Laserfiche WebLink
City of Everett 00 45 13 - 2 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />00 45 13 - 2 BIDDER QUALIFICATION STATEMENT <br />Category 2: Sensive informaon <br />Category 2: For official use only / disclosure permissible by law. <br />Furnish references for information concerning all work listed above. <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />2. The Supplementary Instructions to Bidders (Section 00 22 13) states that the Bidder’s <br />project manager for the Project must satisfy both (a) and (b): <br />(a) Within the twelve years prior to bid opening, the Bidder’s project manager must <br />have successfully served (or be currently successfully serving) as project <br />manager on at least one Similar Project; and <br />(b) Within the twelve years prior to bid opening, the Bidder’s project manager must <br />have successfully served (or be currently successfully serving) as project <br />manager on at least one Similar Excavation Project. This project must be a <br />different project than the project used for (a). <br />Requirements for a project to qualify as a “Similar Project” and “Similar Excavation <br />Project” are listed in Section 00 22 13. List the project manager’s name and projects that <br />show that he or she has this experience. <br /> Name: ____________________________________________ <br /> PROJECT NAME YEAR OWNER LOCATION CONTRACT VALUE <br /> <br /> <br /> <br /> <br /> <br />