My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 5 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 52 13 - 5 AGREEMENT FORM <br />11. Repair of Damage. The Contractor agrees to repair and replace all property of <br />the City and all property of others damaged by it, its employees, subcontractors, <br />suppliers and agents. <br />12. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the <br />work under this contract is to be done at the Contractor’s risk and that: (1) prior to <br />submitting its proposal or bid, it became familiar with the conditions of excavation, <br />subsurface, backfill, materials, climatic conditions, location, traffic, and other <br />contingencies that may affect the work and has made its bid or proposal accordingly <br />and (2) that it assumes the responsibility and risk of all loss or damage to materials or <br />work that may arise from any cause whatsoever prior to completion. <br />13. Headings for Convenience Only. The headings in this document are for <br />convenience only, and shall not be used or considered to interpret or construe this <br />document. <br />14. Effective Date/Counterparts/Signature. This Contract is effective as of the <br />date of the last person to sign it, and may be executed in multiple counterparts, each of <br />which shall be deemed an original. This Contract may be signed with AdobeSign, and <br />any such signature is fully binding. <br /> <br />14. Third-Party Beneficiary. All parties agree that the State of Washington shall be, <br />and is hereby, named as an express third-party beneficiary of this contract, with full <br />rights as such. <br /> <br />[Remainder of Page Intentionally Left Blank] <br />
The URL can be used to link to this page
Your browser does not support the video tag.