My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 1 <br /> <br />TABLE OF CONTENTS <br />VOLUME 1 SPECIFICATIONS <br />DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS Engineer of <br />Record <br />00 00 01 CONTACT LIST C. Gish <br />00 11 13 ADVERTISEMENT FOR BIDS C. Gish <br /> WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER <br />FACILITY SPECIFICATION INSERT <br />C. Gish <br />00 21 13 INSTRUCTIONS TO BIDDERS C. Gish <br />00 22 13 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS C. Gish <br />00 25 13 PRE-BID MEETING C. Gish <br />00 41 13 BID FORM C. Gish <br />00 43 13 BID SECURITY FORM C. Gish <br />00 43 36 PROPOSED SUBCONTRACTORS FORM C. Gish <br />00 45 13 BIDDER QUALIFICATION STATEMENT C. Gish <br />00 45 19 NON-COLLUSION AFFIDAVIT C. Gish <br />00 45 39 RCW 35.22.650 CERTIFICATION C. Gish <br />00 52 13 AGREEMENT FORM C. Gish <br />00 61 13 PERFORMANCE BOND AND PAYMENT BOND C. Gish <br />00 61 23 RETAINAGE BOND C. Gish <br />00 61 25 RETAINAGE ESCROW AGREEMENT C. Gish <br />00 63 25 SUBSTITUTION REQUEST FORM C. Gish <br />00 63 63 CHANGE ORDER – AGREED C. Gish <br />00 63 95 CHANGE ORDER – UNILATERAL C. Gish <br />00 65 19 CERTIFICATE OF COMPLETION FORM C. Gish <br />00 72 00 GENERAL CONDITIONS C. Gish <br />00 73 00 SPECIAL CONDITIONS C. Gish <br />00 73 43 WAGE RATE REQUIREMENTS C. Gish <br />00 73 73 APPRENTICE UTILIZATION C. Gish <br /> <br />DIVISION 01 GENERAL REQUIREMENTS Engineer of <br />Record <br />01 11 00 SUMMARY OF WORK C. Gish <br />01 11 10 GEOTECHNICAL INFORMATION C. Gish <br />01 11 80 ENVIRONMENTAL CONDITIONS C. Gish <br />01 12 16 WORK SEQUENCE C. Gish <br />01 22 13 MEASUREMENT AND PAYMENT C. Gish <br />01 25 00 SUBSTITUTION PROCEDURES C. Gish <br />01 26 00 CONTRACT MODIFICATION PROCEDURES C. Gish <br />01 26 13 REQUESTS FOR INFORMATION (RFI) C. Gish <br />01 29 00 PAYMENT PROCEDURES C. Gish <br />01 29 73 SCHEDULE OF VALUES C. Gish <br />01 31 13 PROJECT COORDINATION C. Gish <br />01 31 19 PROJECT MEETINGS C. Gish
The URL can be used to link to this page
Your browser does not support the video tag.