My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECOND FLOOR NORTH <br />EL 33.01' <br />8" FA <br />8" FA <br />8" FA <br />12" FA <br />8" FA <br />20-G-0208 <br />CHANNEL ISOLATION <br />GATE 2 <br />20-G-0108 <br />CHANNEL ISOLATION <br />GATE 1 <br />1 1 <br />T/INFLUENT BUILDING LOW ROOF <br />EL 42.66' <br />CL EL 46.06' <br />CL EL 51.20' <br />T/ROOF DEBRIS REMOVAL <br />EL 38.28' <br />CL EL 19.19' <br />CL EL 33.12' <br />SLOPE <br />SLOPE <br />2 <br />2 <br />SLOPE 2 <br />0207 <br />PSH <br />12" CS <br />3 <br />4 <br />1" CS <br />0107 <br />PSH <br />3 <br />1" CS <br />D13002D13002 <br />6" CS <br />6" CS <br />TOP OF PIPE EL 41.72' <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/26/2025 10:18:42 AMD-20-3003 <br />317 <br />PROCESS <br />COMBINED SEWER DEBRIS REMOVAL SECTION <br />2 <br />C. BIESEMEYER <br />T. LEMON <br />M. BRAY <br />D-20-1002 SCALE: 1/4" = 1'-0" <br />1 SECTION <br />KEYNOTES: <br />1 EXISTING ACCESS DOOR <br />2 ALL HORIZONTAL RUNS OF THE FOUL AIR (FA) PIPE SHALL <br />HAVE A 1% SLOPE TO DRAIN IN THE DIRECTION OF <br />AIRFLOW. <br />3 BALL VALVE PER SECTION 40 05 63.02. <br />4 STEEL TO HDPE MATERIALS TRANSITION. <br />GENERAL NOTES: <br />1. PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR <br />DESIGN OF ALL PIPE SUPPORTS PER SECTION 40 05 01. ANY <br />PIPE SUPPORTS SHOWN ON THE DRAWINGS ARE <br />CONCEPTUAL ONLY. <br />2. PARAPET WALL ON DEBRIS REMOVAL DECK HIDDEN FOR <br />CLARITY. <br />1 09/03/25 C. GISH CONFORMED DRAWING PER ADDENDUM NO. 4
The URL can be used to link to this page
Your browser does not support the video tag.