My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 1 <br /> <br /> <br />10HP 10HP <br />DEBRIS REMOVAL <br />CLASS I, DIV 1 LOCATION <br /> <br />10HP 10HP <br /> <br /> <br />45HP 45HP 45HP <br /> 1 <br />10HP <br /> <br />VFD <br />FVNRFVNR <br />30A 30A 30A <br />100A 100A 100A <br />VFD VFD <br />VFDVFD <br />ODOR CONTROL <br />CLASS I, DIV 2 LOCATION <br />DEBRIS REMOVAL <br />CLASS I, DIV 1 LOCATION <br />EFFLUENT PUMP STATION WET WELL <br />CLASS I, DIV 1 LOCATION <br />T T <br />T T T <br />3PH, 4W, 480V, 600A, 50kAIC <br />75AT <br />LSI <br />125AT <br />LSI <br />80AT <br />LSI 90AT 90AT 90AT <br /> <br /> 1 FVNR <br />BKR0001A <br />70-SWBD-0001A <br />3PH, 4W, 1600A, <br />50kAIC <br />70-SWBD-0001 <br />SNOPUD <br />SERVICE "PGSF" <br />70-XFMR-0101SNOPUD UTILITY <br />TRANSFORMER 12470V 480/277 <br />1000kVA <br />OMES BUILDING ELECTRICAL ROOM <br />70-MCC-0101 <br />70-PNL-3000 <br />480/277 100A MB <br />70-PNL-3001 <br />120/208 200A, 150A MB <br />70-XFMR-0002 <br />480-120/208 <br />45kVA <br />20-LCP-0102 <br />OEM PANEL <br />AREA 20 AREA 60 <br />20-CON-0105 <br />SCREEN <br />CONVEYOR 1 <br />20-CON-0106 <br />SCREEN <br />CONVEYOR 2 <br />20-F-0001 <br />FOUL AIR FAN <br />20-SCRN-0102 <br />SCREEN 1 <br />20-SCRN-0202 <br />SCREEN 2 60-VFD-010160-P-0101 <br />EFFLUENT PUMP <br />1 60-VFD-010260-P-0102 <br />EFFLUENT PUMP <br />2 60-VFD-010360-P-0103 <br />EFFLUENT PUMP <br />3 SEE DRAWING EP-10-5002 FOR CONTINUATION70-SWBD-0101 <br />BKR0101 <br /> <br /> 1 <br />INFLUENT BUILDING <br />4HP <br />FVNR <br />30A <br />25-P-6001 <br />INFLUENT <br />BUILDING SUMP <br />PUMP <br />70-ATS-0001 <br />3P4W 100A <br />50KAIC <br />SEE DRAWING <br />EP-10-5003 <br />SEE DRAWING <br />EP-10-5003 <br />70-ATS-0002 <br />3P3W 100A <br />50KAIC <br />NORMAL BACK UP NORMAL BACK UP <br />EUSERC <br />CABINET <br />20-PNL-3000 <br />480/277 <br />25-PNL-3000 <br />480/277 <br />50-PNL-3000 <br />480/277 <br /> <br />INFLUENT <br />BUILDING <br />DEBRIS <br />REMOVAL <br />FLOW <br />DISTRIBUTION STORAGE SHED <br />1200AT <br />1600AF <br />ASLIG <br />1200AT <br />1600AF <br />ALSIG <br />70-PNL-7001 <br />CONTROL OIT (REMOTE) <br />SEE DRAWING EP-10-5004 FOR DETAILS <br />SEE SPECIFICATION 26 24 13 FOR <br />REQUIREMENTS <br />SPDPQM <br />4P <br />3P 600AT <br />LSI <br />20AT3P <br />LSI <br />20AT3P <br />LSI <br />20AT3P <br />LSI <br />20AT3P <br />LSI <br />70-SWBD-0101 AND 70-SWBD-0001 <br />CONTROL WIRING SHALL BE <br />CONNECTED BY INSTALLING <br />CONTRACTOR VIA UNDERGROUND <br />CONDUIT DURING CONSTRUCTION <br />3P 3P 3P 3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />SWBD INTERNAL CONTROLS WIRING FOR MAIN AND TIE BREAKER CONTROL <br />SWBD INTERNAL CONTROLS WIRING FOR MAIN AND TIE BREAKER CONTROL <br />52 <br />524P <br />AREA 25 AREA 20 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />20-PNL-3001 <br />MINI POWER <br />CENTER <br />22.5KVA <br />480-120/208 TFR <br />25-PNL-3001 <br />MINI POWER <br />CENTER <br />22.5KVA <br />480-120/208 TFR <br />50-PNL-3001 <br />MINI POWER <br />CENTER <br />22.5KVA <br />480-120/208 TFR <br />06-PNL-3001 <br />MINI POWER <br />CENTER <br />15KVA <br />480-120/208 TFR <br />3P 3P 3P70AT <br />LSI <br />70AT <br />LSI <br />70AT <br />LSI <br />60-PNL-3000 <br />480/277 <br /> <br />EFFLUENT <br />PUMP STATION <br /> <br /> <br />60-PNL-3001 <br />MINI POWER <br />CENTER <br />22.5KVA <br />480-120/208 TFR <br />3P 70AT <br />LSI <br />K <br />EXTERNAL CONNECTION <br />WIRING TO BE COMPLETED BY <br />INSTALLING CONTRACTOR <br />DURING CONSTRUCTION <br />SWBD INTERNAL WIRING FOR MAIN AND TIE BREAKER <br />CONTROL FROM DRAWINGS EP-10-5002 AND EP-10-5003 <br />2 <br /> 480VAC - 120VAC <br />3 SEE DETAIL A / EP-10-5002SEE DETAIL <br />A / EP-10-5002 <br />3 <br />70-CPT-0001 <br />K <br />SEE DETAIL <br />A / EP-10-5002 <br />70-PLC-7001 <br />SWBD <br />CONTROLLER <br />1 <br />444 <br /> 70A 70A 70A 70A 40A <br />55755 <br />1 OIT'S AND SWITCHBOARD CONTROLLER ARE <br />CONTROLLED BY KIRK KEYS. OIT AT <br />SWITCHBOARD AND REMOTELY MOUNTED OIT <br />MUST BOTH HAVE KEYS TURNED TO 'CONTROL <br />ACTIVE' TO ENABLE SWITCHBOARD <br />AUTOMATION. KIRK KEYS MUST BE PRESENT <br />TO CHANGE MODES. REMOVING EITHER KEY <br />WHILE IN THE 'CONTROL ACTIVE' STATE LOCKS <br />AUTOMATION IN CURRENT MODE (AUTO, SEMI <br />AUTO, OR MANUAL) <br />2 BREAKER STATUS IS MONITORED BY <br />SWITCHBOARD CONTROLLER AND DISPLAYED <br />ON OIT. NO AUTOMATIC SWITCHING. <br />3 BREAKERS ARE OPENED AND CLOSED BY <br />SWITCHBOARD CONTROLLER, AND STATUS IS <br />MONITORED BY SWITCHBOARD CONTROLLER <br />AND DISPLAYED ON OIT. REFER TO DRAWING <br />EP-10-5004. <br />4 COORDINATE BREAKER SIZE WITH VFD <br />MANUFACTURER RECOMMENDATIONS. <br />KEY NOTES: <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />500RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PATH/FILENAME: C:\Users\scanas\DC\ACCDocs\BC ACC Project Hub\97190 - Port Gardener Wet Weather Design\Project Files\300 Design\CAD\011 E\Sheets\3525-EP-10-5001.dwgLAST UPDATE: August 06, 2025 @ 05:39:00 pmPLOT DATE: August 06, 2025 @ 05:39:29 pm12/2/2024 ZB <br /> <br /> <br /> <br /> <br />ELECTRICAL POWER <br />MAIN SWITCHBOARD OVERALL <br />ONE-LINE DIAGRAM <br />EP-10-5001 <br />409 <br /> <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />1.ALL OTHER EQUIPMENT SHOWN ARE FOR <br />INFORMATIONAL PURPOSES ONLY. <br />GENERAL NOTES: <br />09/03/2025 ZB
The URL can be used to link to this page
Your browser does not support the video tag.