My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />160HP 160HP 160HP <br /> <br />VFD <br />400A 400A <br />VFD VFD <br />LIFT STATION 46 WET WELL <br />CLASS I, DIV 1 LOCATION <br />T T T <br />80AT 300AT <br />70-SWBD-0002A <br />3PH, 4W, 1600A, 50kAIC <br />70-SWBD-0002 <br />OMES BUILDING ELECTRICAL ROOM <br />AREA 60 <br />46-VFD-0101 <br />46-P-0101 <br />DIRECT FLOW <br />PUMP 1 <br />46-VFD-0102 <br />46-P-0102 <br />DIRECT FLOW <br />PUMP 2 <br />46-VFD-0103 <br />46-P-0103 <br />DIRECT FLOW <br />PUMP 3SEE DRAWING EP-10-5002 FOR CONTINUATION <br />VFD46-VFD-0201 <br /> <br />VFD46-VFD-0202 <br />300AT 300AT 90AT 90AT <br />400A <br />45HP <br />100A <br />T <br />46-P-0201 <br />INDIRECT FLOW <br />PUMP 1 <br />45HP <br />100A <br />T <br />46-P-0202 <br />INDIRECT FLOW <br />PUMP 2 <br />TO 70-ATS-0002 <br />SEE DRAWING <br />EP-10-5001 <br /> 125AT <br />TO 70-ATS-0001 <br />SEE DRAWING <br />EP-10-5001 <br />SNOPUD <br />SERVICE "PGSF" <br />46-XFMR-0101SNOPUD UTILITY <br />TRANSFORMER <br />12470 480/277 <br />1000kVA <br />46-SWBD-0101EUSERC <br />CABINET <br />46-PNL-3000 <br />480/277 <br /> 70AT <br />LIFT <br />STATION 46 <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />3P <br />LSI <br />BKR0002A <br />1200AT <br />1600AF <br />4P <br />ALSIG <br />BKR0101 <br />1200AT <br />1600AF <br />4P <br />ALSIG <br />46-SWBD-1010 AND 70-SWBD-001 <br />CONTROL WIRING SHALL BE <br />CONNECTED BY INSTALLING <br />CONTRACTOR VIA UNDERGROUND <br />CONDUIT DURING CONSTRUCTION <br />SWBD INTERNAL WIRING FOR MAIN <br />AND TIE BREAKER CONTROL, PLC <br />CONNECTION ON DRAWING EP-10-5001 <br />SPD PQM <br />52 <br />52 <br /> <br /> <br />46-PNL-3001 <br />MINI POWER <br />CENTER <br />22.5KVA <br />480-120/208 TFR <br />480VAC - 120VAC <br />3 <br />SEE DETAIL <br />A / EP-10-5002 <br />33333 <br /> 70A <br />55755 <br /> <br /> <br /> <br /> <br />ELECTRICAL POWER <br />LIFT STATION 46 SWITCHBOARD <br />OVERALL ONE-LINE DIAGRAM <br />EP-10-5003 <br />411 <br /> <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />500RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PATH/FILENAME: C:\Users\scanas\DC\ACCDocs\BC ACC Project Hub\97190 - Port Gardener Wet Weather Design\Project Files\300 Design\CAD\011 E\Sheets\3525-EP-10-5003.dwgLAST UPDATE: August 06, 2025 @ 05:42:36 pmPLOT DATE: August 06, 2025 @ 05:42:49 pm12/2/2024 ZB <br />1.ALL OTHER EQUIPMENT SHOWN ARE FOR INFORMATIONAL PURPOSES ONLY. <br />GENERAL NOTES: <br />1 BREAKER STATUS IS MONITORED BY SWITCHBOARD CONTROLLER AND <br />DISPLAYED ON OIT. NO AUTOMATIC SWITCHING. <br />2 BREAKERS ARE OPENED AND CLOSED BY SWITCHBOARD CONTROLLER, <br />AND STATUS IS MONITORED BY SWITCHBOARD CONTROLLER AND <br />DISPLAYED ON OIT. REFER TO DRAWING EP-10-5004. <br />3 COORDINATE BREAKER SIZE WITH VFD MANUFACTURER <br />RECOMMENDATIONS. <br />KEY NOTES: <br />09/03/2025 ZB
The URL can be used to link to this page
Your browser does not support the video tag.