Laserfiche WebLink
46-XFMR-0101 <br />46-SWBD-0101 <br />U/G VAULT <br />EQUIPMENT PAD <br />EQUIPMENT PAD <br />LIFT STATION 46 <br />DB0001B <br />DB0004B <br />METERING CABINET <br />UTILITY POLE <br />FENCE LINE <br />DB0046 <br />E11001 TYP <br />1 <br />6 <br />EP-10-3001 <br />DB0010 <br />5 <br />EP-10-3001 <br />2 <br />EP-10-3001 <br />16 <br />EP-10-3001DB0005 <br />2 <br />2 <br />2 <br />PROPERTY LINE <br />6 <br />P10031 <br />10-XFMR-3001 <br />P10032 <br />10-PNL-30015 5 <br />3 <br />4 <br />4 <br />E12002 <br />46-PB-3500 <br />10-CJB-0002 <br />10-ZS-4001 <br />10-FSH-4100 <br />C10006 <br />C10010 <br />C10005 <br />C10009 <br />10-ZS-4002 <br />10-FSH-4000 <br />10-BP-4100 <br />10-BP-4000 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGEAutodesk Docs://157889 - PGSF/E-3525-10V23.rvt8/6/2025 2:46:55 PMEP-46-1002 <br />426 <br />ELECTRICAL POWER <br />LIFT STATION 46 SERVICE ENTRANCE POWER <br />AND CONTROL PLAN <br />C. BJORKLUND <br />S. CANAS <br />J. TUCKER <br />SCALE: 1/8" = 1'-0" <br />PLAN <br />GENERAL NOTES: <br />1. EQUIPMENT PAD AND VAULT PER SNOPUD STANDARD <br />DETAIL ESR FIGURE 4-35. <br />2. CLEARANCES AROUND TRANSFORMER PAD MUST MEET <br />ESR 4-32. <br />3. SEE DRAWING G-46-0002 FOR HAZARDOUS AREA <br />BOUNDARIES. EQUIPMENT MUST BE RATED FOR THE <br />HAZARDOUS AREA IT IS LOCATED IN. <br />KEYNOTES: <br />1 LIFT STATION 46 DIRECT PUMP FLOWMETER VAULT. SEE <br />DRAWING EC-10-2001 FOR SIGNAL AND DATA PLAN. <br />2 CIRCUITS GOING OUT TO THE BACK FLOW PREVENTER <br />LEAVE AREA 46 THROUGH DB0004B, THROUGH MH0101, <br />INTO DB0001B, THEN CIRCUITS BRANCH OFF INTO DB0010 <br />TO THE BACK FLOW PREVENTER STRUCTURE. <br />3 UTILITY VAULT PER SNOPUD STANDARD DETAIL V0207. <br />PROVIDE HS-20 COVER INSTEAD OF H-20. COORDINATE <br />FINAL LOCATION WITH SNOPUD AND CITY OF EVERETT. <br />4 COORDINATE WORK OUTSIDE OF PROPERTY LINE WITH <br />CITY AND SNOPUD AS REQUIRED FOR EXCAVATION, <br />POLE SUPPORT, AND CONNECTION. <br />5 BACKFLOW PREVENTER STRUCTURE IS A <br />MANUFACTURED BUILDING THAT COMES WITH LOOSE <br />TRANSFORMER, ELECTRICAL PANEL, LIGHTS, AND <br />HEATERS. MOUNT AND WIRE PER MANUFACTURER <br />INSTRUCTIONS. REFER TO SPECIFICATIONS. <br />6 RE-FEED EXISTING LIGHT POLE. RUN CONDUIT FROM <br />DUCT BANK, ALONG WALL OF BACKFLOW PREVENTER <br />BUILDING AND UNDERGROUND TO POLE. SEE DRAWING <br />EL-10-1001. <br />09/03/2025 ZB