Laserfiche WebLink
T/BOTTOM PLAN <br />EL 10.78' <br />Ab Ac Ba Bb Bc <br />SECOND FLOOR NORTH <br />EL 33.01' <br />B <br />8" FA <br />36" FRP <br />36" FRP <br />3" PD <br />4" PD <br />18" CS <br />C <br />36" FRP <br />36" FRP <br />T/INFLUENT BUILDING HIGH ROOF <br />EL 52.07' <br />T/INFLUENT BUILDING LOW ROOF <br />EL 42.66' <br />4" CS <br />1 <br />22 <br />3 4 <br />5 <br />25-P-0001 <br />INFLUENT BUILDING <br />SUMP PUMP <br />6 <br />7 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/26/2025 10:18:49 AMD-25-3001 <br />320 <br />PROCESS <br />INFLUENT BUILDING SECTIONS 1 <br />C. BIESEMEYER <br />T. LEMON <br />M. BRAY <br />KEYNOTES: <br />1 FLEXIBLE RUBBER DUCK BILL CHECK VALVE, RED VALVE, <br />TIDEFLEX 35 OR EQUAL. <br />2 HYDROSTATIC TEST EXISTING 36" FRP PIPE. SUBMIT TEST <br />RESULTS AND IDENTIFY ANY LEAKS. PIPE SHALL BE <br />TESTED TO OPERATIONAL PRESSURE. <br />3 REPLACE OFFSET FITTING IN KIND, FLANGE TO FLANGE. <br />FIELD VERIFY FITTING CONFIGURATION. <br />4 PROVIDE DEWATERING OF THE CONCRETE <br />CHANNEL/PIPING. <br />5 INSTALL STEEL CL 150 BLIND FLANGE ON EXISTING. <br />6 INSTALL STEEL CL 150 REDUCING FLANGE, COAT BOTH <br />SIDES WITH LIQUID EPOXY PER PIPING SYSTEM <br />SCHEDULE. MATCH FLANGE BOLT PATTERN OF FRP <br />FLANGE. <br />7 HYDROSTATIC TEST EXISTING 18" FRP PIPE. SUBMIT TEST <br />RESULTS AND IDENTIFY ANY LEAKS. PIPE SHALL BE <br />TESTED TO OPERATIONAL PRESSURE. <br />D-25-1001 SCALE: 1/4" = 1'-0" <br />1 INFLUENT BUILDING SECTION <br />1 09/03/25 M. BRAY CONFORMED DRAWING PER ADDENDUM NO. 5